CHEMICAL FEED UPGRADES AND BULK WATER UPGRADES <br /> City Projects 2022-02 AND 2022-15 <br /> February 14, 2024 <br /> 1. QUESTION: The specifications require that only one system be upgraded at a time. Is <br /> there a required order in which the systems are to be upgraded? <br /> ' ANSWER: There is not a required order in which the systems need to be upgraded. <br /> The City would prefer that the lime feed system be upgraded as soon as possible,but <br /> it is not a contract requirement. <br /> ' 2. QUESTION: Does the contractor need to notify IEPA when individual systems are <br /> being upgraded? <br /> ANSWER: No, the contractor is not required to notify IEPA when individual systems <br /> ' are being upgraded. . <br /> 3. QUESTION: Is an engineer's estimate available? <br /> ANSWER: The City does not publish an engineer's estimate for its projects. <br />