My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-244 City Project 2021 01
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-244 City Project 2021 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2024 12:20:44 PM
Creation date
6/19/2024 12:18:51 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-244
Res Ord Title
R2024-244 Resolution Authorizing the Execution of an Agreement with the Norfolk Southern Railway Company for a Storm Sewer Crossing for the Oakland and Grand Sewer Separation Project, City Project 2021-01
Department
Public Works
Approved Date
6/3/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:6D021E17-6D9E-408B-875B-C4AA671332C5 <br /> for the RPL insurance, including but not limited to additional insured status for Railway and its <br /> parent, subsidiary and affiliated companies. <br /> (ix) Applicant shall furnish their memorandum of insurance and the RPL Insurance <br /> Policy to Railway's Managing Agent prior to execution of this Agreement at <br /> ns.permittingCcDrailpros.com. The insurance coverage required herein shall in no way limit <br /> Applicant's liability under this Agreement. <br /> • Railway shall, at Railway's option, furnish, at the sole expense of Applicant, Support Services. The <br /> term "Support Services" means such materials and services as necessary, in Railway's sole judgment, <br /> to support Railway's tracks and to protect Railway's traffic, including without limitation flagging services <br /> and construction monitoring during the installation, maintenance, repair, renewal or removal of the <br /> Facilities. Support Services shall be provided unless Railway's Division Engineer or his or her <br /> authorized representative provides to Applicant a written waiver of Support Services, whether in whole <br /> or in any part, in a given instance. The term "Construction Monitoring" means services comprised of <br /> one or more Railway representatives being assigned and present to monitor construction activities of <br /> Applicant, which may include a preconstruction site assessment and a post-construction site <br /> assessment. <br /> • Prior to commencement of any work to be performed on or about Premises, Applicant shall notify the <br /> appropriate Division Engineer or their authorized representative for the scheduling of "Support <br /> Services". Within seventy-two (72) hours after the Division Engineer's or their authorized <br /> representative's actual receipt of such notification, they shall review the necessity and availability of <br /> Support Services for the proposed work and advise Applicant of such matters and the estimated cost <br /> therefor. No work shall be permitted on or about the Premises without the presence of Railway's <br /> Support Services or the Division Engineer's waiver of the requirement for Support Services. Entry on <br /> or about the Premises or any other Railway right-of-way without the Division Engineer's prior approval <br /> shall be deemed trespassing. Applicant agrees to pay Railway, within thirty (30) days after delivery of <br /> an invoice therefor, for any protection and inspection costs incurred by Railway, in Railway's sole <br /> judgment, during any such entry. <br /> • In the event it becomes necessary for Applicant to deviate from the approved plans and specifications, <br /> Applicant shall seek prior approval from Railway's Division Engineer or his or her authorized <br /> representative and, when applicable, an authorized representative of the Division Engineer in the field <br /> during Construction Monitoring or inspection. <br /> • All cost or expense resulting from any and all loss of life or property, or injury or damage to the person <br /> or property of any person, firm or corporation (including the parties hereto and their respective officers, <br /> agents and employees) and any and all claims, demands or actions for such loss, injury or damage, <br /> caused by or growing out of the presence or use, or the construction, maintenance, renewal, change <br /> or relocation and subsequent removal of the Facilities and appurtenances herein referred to shall be <br /> borne by Applicant unless caused solely by the negligence or willful misconduct of Railway. <br /> • Upon abandonment of the Facilities by Applicant, Applicant shall seek direction from Railway's Chief <br /> Engineer, or his representative, regarding the method of abandonment if the Facilities will be <br /> abandoned in place. <br /> • In the event the Facilities consist of electrical power or communication wires and appurtenances, <br /> Applicant shall promptly remedy any inductive interference growing out of, or resulting from the <br /> presence of, the Facilities. <br /> • In the event the Facilities consist of an underground occupation, Applicant will be responsible for any <br /> settlement caused to the roadbed, right of way and/or tracks, facilities and appurtenances of Railway <br /> arising from or as a result of the installation of the Facilities, and Applicant shall pay to Railway on <br /> demand the full cost and expense. <br /> • All rights and obligations conferred hereby shall extend to the successors and assigns of the parties <br /> hereto, provided that the Applicant shall in no event transfer or assign its rights hereunder without the <br /> written consent of Railway, which will not be unreasonably withheld. <br />
The URL can be used to link to this page
Your browser does not support the video tag.