My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-269 Resolution Authorizing a Consolidated Rail Infrastructure and Safety Improvement Grant Agreement for Construction Engineering Services for the Improvement of Brush College Road over Faries Parkway and the Norfolk Southern Railroad Tracks
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2024-269 Resolution Authorizing a Consolidated Rail Infrastructure and Safety Improvement Grant Agreement for Construction Engineering Services for the Improvement of Brush College Road over Faries Parkway and the Norfolk Southern Railroad Tracks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2024 10:24:36 AM
Creation date
7/17/2024 10:24:24 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-269
Res Ord Title
R2024-269
Department
Public Works
Approved Date
7/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fU.S.Department of Transportation <br /> 9h) Federal Railroad Administration <br /> 8.3 Project Outcomes Report <br /> Where indicated in Article 7 of Attachment 2 of this Agreement,the Recipient will submit to <br /> FRA, not later than January 31St of the year that follows the final year during which data were <br /> collected, a Project Outcomes Report that contains: <br /> (a) an analysis of the impacts of the Project, including a comparison of the baseline <br /> performance measurement data collected under Section 8.1 of this Attachment 1 with the <br /> post-project performance measurement data that the Recipient reported in the final Post- <br /> Project Performance Measurement Report required under Section 8.2 of this Attachment <br /> 1; <br /> (b) for each performance measure that is identified in Article 7 of Attachment 2 of this <br /> Agreement, an analysis of the accuracy of the projected outcome; and <br /> (c) all data collected under Sections 8.1 and 8.2 of this Attachment 1; <br /> (d) additional information as directed. <br /> 8.4 General Performance Measurement Requirements <br /> The Recipient will ensure that all data collection for each performance measure identified in <br /> Article 7 of Attachment 2 of this Agreement is completed in a manner consistent with the <br /> description, location, and other attributes associated with that performance measure. <br /> 8.5 Outcome Measurement and Reporting Survival <br /> The data collection and reporting requirements in Article 8 of this Attachment 1 survive the <br /> termination of this Agreement. FRA may consider the Recipient's compliance with this <br /> requirement after closeout of the grant in its evaluation of future applications for Federal <br /> financial assistance. <br /> ARTICLE 9: NONCOMPLIANCE AND REMEDIES <br /> 9.1 Noncompliance Determinations <br /> (a) Notice of Proposed Determination. If FRA determines that the Recipient may have <br /> failed to comply with the United States Constitution, Federal law, or the terms and <br /> conditions of this Agreement, FRA will notify the Recipient of a proposed determination of <br /> noncompliance through a written notice that: <br /> (1) explains the noncompliance; <br /> (2) describes a proposed remedy that is consistent with Section 9.2 of this <br /> Attachment 1; <br /> (3) describes the process and form in which the Recipient may respond to the <br /> notice that is consistent with Section 9.1(b) of this Attachment 1; and <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.