Laserfiche WebLink
U.S.Department of Transportation <br /> Federal Railroad Administration <br /> (d) Existing Codes or Standards.This Section does not require the Recipient to implement <br /> a new code or standards of conduct where a state statute, or written code or standards of <br /> conduct, already effectively covers all of the required elements. <br /> (e) Disclosure of Conflicts.The Recipient will disclose in writing any potential conflict of <br /> interest to FRA or pass-through entity. <br /> 23.6 Changed Conditions of Performance <br /> The Recipient will notify FRA of any event that may affect its ability to perform the Project in <br /> accordance with the terms of this Agreement. <br /> 23.7 Litigation <br /> The Recipient will notify FRA in writing of any decision pertaining to the Recipient's conduct of <br /> litigation that may affect FRA's interests in the Project or FRA's administration or enforcement of <br /> applicable Federal laws or regulations.The Recipient will inform FRA in writing before naming <br /> FRA as a party to any type of litigation for any reason in any forum. <br /> 23.8 Bipartisan Infrastructure Law Signage Guidelines <br /> For projects funded by the Bipartisan Infrastructure Law, also known as the Infrastructure <br /> Investment and Jobs Act, Pub. L. No. 117-58(2021),the Recipient will ensure: <br /> (a) signage is designed consistent with the guidelines and design specifications available <br /> at https:/Iwww.whitehouse.gov/wp-content/uploads/2023/02/Investing-in-America- <br /> Brand-Guide.pdf. Signs should include the official Investing in America logo and identify <br /> the project as "funded by President Biden's Bipartisan Infrastructure Law." <br /> (b) signage displays the FRA logo and the Recipient logo, if any, along with the official <br /> Investing in America logo. The FRA logo should not be displayed in a manner that implies <br /> FRA itself is conducting the project. <br /> (c) where applicable,the signage includes the project name (e.g., [Name of] Project <br /> funded by President Biden's Bipartisan Infrastructure Law.) <br /> (d) the sign is placed at construction sites where it is clearly visible near the location of <br /> work and that the sign is maintained in good condition throughout the construction <br /> period. <br /> (e) signs on equipment are placed in an easily visible location and maintained in good <br /> condition <br /> 23.9 Equipment and Supplies <br /> The Recipient will maintain written policies and procedures that address acquisition, <br /> classification,and management of all equipment and supplies acquired or used under this <br /> award. <br /> 33 <br />