My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-269 Resolution Authorizing a Consolidated Rail Infrastructure and Safety Improvement Grant Agreement for Construction Engineering Services for the Improvement of Brush College Road over Faries Parkway and the Norfolk Southern Railroad Tracks
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2024-269 Resolution Authorizing a Consolidated Rail Infrastructure and Safety Improvement Grant Agreement for Construction Engineering Services for the Improvement of Brush College Road over Faries Parkway and the Norfolk Southern Railroad Tracks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2024 10:24:36 AM
Creation date
7/17/2024 10:24:24 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-269
Res Ord Title
R2024-269
Department
Public Works
Approved Date
7/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U.S.Department of Transportation <br /> Federal Railroad Administration <br /> (d) Existing Codes or Standards.This Section does not require the Recipient to implement <br /> a new code or standards of conduct where a state statute, or written code or standards of <br /> conduct, already effectively covers all of the required elements. <br /> (e) Disclosure of Conflicts.The Recipient will disclose in writing any potential conflict of <br /> interest to FRA or pass-through entity. <br /> 23.6 Changed Conditions of Performance <br /> The Recipient will notify FRA of any event that may affect its ability to perform the Project in <br /> accordance with the terms of this Agreement. <br /> 23.7 Litigation <br /> The Recipient will notify FRA in writing of any decision pertaining to the Recipient's conduct of <br /> litigation that may affect FRA's interests in the Project or FRA's administration or enforcement of <br /> applicable Federal laws or regulations.The Recipient will inform FRA in writing before naming <br /> FRA as a party to any type of litigation for any reason in any forum. <br /> 23.8 Bipartisan Infrastructure Law Signage Guidelines <br /> For projects funded by the Bipartisan Infrastructure Law, also known as the Infrastructure <br /> Investment and Jobs Act, Pub. L. No. 117-58(2021),the Recipient will ensure: <br /> (a) signage is designed consistent with the guidelines and design specifications available <br /> at https:/Iwww.whitehouse.gov/wp-content/uploads/2023/02/Investing-in-America- <br /> Brand-Guide.pdf. Signs should include the official Investing in America logo and identify <br /> the project as "funded by President Biden's Bipartisan Infrastructure Law." <br /> (b) signage displays the FRA logo and the Recipient logo, if any, along with the official <br /> Investing in America logo. The FRA logo should not be displayed in a manner that implies <br /> FRA itself is conducting the project. <br /> (c) where applicable,the signage includes the project name (e.g., [Name of] Project <br /> funded by President Biden's Bipartisan Infrastructure Law.) <br /> (d) the sign is placed at construction sites where it is clearly visible near the location of <br /> work and that the sign is maintained in good condition throughout the construction <br /> period. <br /> (e) signs on equipment are placed in an easily visible location and maintained in good <br /> condition <br /> 23.9 Equipment and Supplies <br /> The Recipient will maintain written policies and procedures that address acquisition, <br /> classification,and management of all equipment and supplies acquired or used under this <br /> award. <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.