My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-273 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Preliminary Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-273 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Preliminary Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow and Infiltration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 11:39:49 AM
Creation date
8/8/2024 11:39:45 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-273
Res Ord Title
R2024-273 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy and Tilly, Inc., to Provide Preliminary Engineering Services for the Lost Bridge North Basin and Florian Basin Inflow
Department
Public Works
Approved Date
8/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Consulting Engineer expressly acknowledges,recognizes and agrees that the only authority to <br /> approve Amendments to this Agreement or the Scope or Services or the cost(s)therein is with the <br /> City Council of the City. <br /> SECTION II. BASIC SERVICES <br /> A. STUDY AND REPORT PHASE. <br /> The Consulting Engineer shall: <br /> 1. Ci 's Requirements. Review available data and consult with the City's Representative to clarify <br /> and define the City's requirements for the Project. <br /> 2. Advise Regarding Additional Data. Advise the City's Representative as to the necessity of the <br /> City's providing or obtaining from others data or services of the types described in Section V(C) <br /> in order to evaluate or complete the Project,and act as the City's representative in connection <br /> with any such services. <br /> 3. Technical Analysis. Provide analysis of the City's needs,planning surveys, site evaluations, and <br /> comparative studies of prospective sites and solutions. <br /> 4. Economic Analysis. Provide a general economic analysis of the City's requirements applicable to <br /> various alternatives in accordance with economic parameters and assumptions provided by the <br /> City's Representative. <br /> 5. Report Preparation. Prepare a report("Study Report")containing schematic layouts, sketches and <br /> conceptual design criteria with appropriate exhibits to indicate clearly the considerations involved <br /> and the alternative solutions available to the City of Decatur. The Study Report shall also set <br /> forth the Consulting Engineer's findings and recommendations with opinions of probable costs <br /> for the Project,including construction cost, contingencies, allowances for charges of all <br /> professionals and consultants,allowances for the cost of land and rights-of-way, allowances for <br /> the relocation of utility facilities and equipment if necessary, and compensation for or damages to <br /> properties and interest and financing charges(all of which are hereinafter called"Project Costs"). <br /> Specific requirements for the Study Report are included in Exhibit A, Scope of Services. <br /> 6. Report Presentation. Furnish paper copies and digital copies of the Study Report in the number <br /> and format specified in Exhibit A, Scope of Work, and present and review the Study Report in <br /> person with the City as the City's Representative shall direct. The cost of reproduction of the <br /> Study Report shall be considered a reimbursable expense and paid in accordance with Section <br /> V(C)of this Agreement. <br /> 7. Completion Time. The Study Report shall be completed, submitted and accepted by the City's <br /> Representative within the time period set forth in Exhibit C,Project Timeline. <br /> SECTION III. CITY'S RESPONSIBILITIES <br /> The City shall, <br /> A. FURNISH REQUIREMENTS AND LIMITATIONS. Provide all criteria and full information as <br /> to the City's requirements for the Project,including design objectives and constraints, space,capacity <br /> and performance requirements,flexibility and expandability, economic parameters and any budgetary <br /> 2 <br /> Last Revised:2/03/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.