My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-294 Resolution Authorizing a Professional Services Agreement with Christy-Foltz, Inc. to Provide Engineering, Labor and Material to Reinstall a Section of Fish Barrier on Lake Decatur Dam
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-294 Resolution Authorizing a Professional Services Agreement with Christy-Foltz, Inc. to Provide Engineering, Labor and Material to Reinstall a Section of Fish Barrier on Lake Decatur Dam
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 10:23:08 AM
Creation date
9/5/2024 10:23:06 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-294
Res Ord Title
R2024-294 Resolution Authorizing a Professional Services Agreement with Christy-Foltz, Inc. to Provide Engineering, Labor and Material to Reinstall a Section of Fish Barrier on Lake Decatur Dam
Department
Public Works
Approved Date
9/3/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. PREVAILING WAGES AND MINORITY PARTICIPATION GOALS The City Code <br /> requirements for Minority Participation Goals for Public Works Contracts are in effect for all <br /> work items that require the payment of Prevailing Wages.The payment of prevailing wages <br /> is required for all construction or demolition of public works. Typical activities requiring <br /> payment of prevailing wages on this project may include crane work,repairs and painting. <br /> Professional services such as engineering design does not require the payment of prevailing <br /> wages. The minority participation goals are as follows: <br /> 1. Ten percent(10%) of the total dollar amount of the contract should be performed by <br /> minority business enterprises; and <br /> 2. Eighteen percent(18%)of the total hours worked should be performed by minority <br /> workers. <br /> The Professional Services Provider shall provide evidence of meeting the City's minority <br /> participation goals prior to all payment made for completion of work requiring the payment <br /> of prevailing wages. If the Professional Services Provider is unable to meet the minority <br /> participation goals, a waiver request may be submitted, along with substantial evidence of a <br /> good faith effort to meet the goals.Exhibit H includes all of the required information and <br /> documentation. <br /> SECTION III. CITY'S RESPONSIBILITIES <br /> The City shall, <br /> A. FURNISH REQUIREMENTS AND LIMITATIONS Provide all criteria and full information as <br /> to the City's requirements for the Project,including objectives and constraints,space,capacity and <br /> performance requirements,flexibility and expandability,economic parameters and any budgetary <br /> limitations; and furnish copies of all design and construction standards as required. <br /> B. FURNISH INFORMATION. Assist the Professional Service Provider by placing at the <br /> Professional Service Provider's disposal all available information pertinent to the Project including <br /> previous reports and any other data relative to design or construction of the Project. <br /> C. FURNISH TECHNICAL INFORMATION. Furnish to the Professional Service Provider,as <br /> required for performance of the Professional Service Provider's Basic Services(except to the extent <br /> provided otherwise in Exhibit A,"Scope of Work"),data prepared by or services of others,including <br /> without limitation,core borings,probings and subsurface explorations,hydrographic surveys, <br /> laboratory tests and inspections of samples,materials and equipment;appropriate professional <br /> interpretations of all of the foregoing;environmental assessment and impact statements;property, <br /> boundary,easement,right-of-way,topographic and utility surveys;property descriptions; zoning, <br /> deed and other land use restriction;all of which the Professional Service Provider may rely upon in <br /> performing the Professional Service Provider's services. <br /> D. SURVEYS AND REFERENCE POINTS. Provide field control surveys and establish reference <br /> points and base lines except to the extent provided otherwise in Section II to enable the Contractor(s) <br /> to proceed with the layout of the work. <br /> E. ACCESS TO PROPERTY. Except as maybe modified by the Scope of Work,Exhibit A,arrange <br /> for access to and make all provisions for the Professional Service Provider to enter upon public and <br /> private property as required for the Professional Service Provider to perform the Professional Service <br /> Provider's services. <br /> Last Revised;2017-06-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.