My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-269 Resolution Authorizing a Consolidated Rail Infrastructure and Safety Improvement Grant Agreement for Construction Engineering Services for the Improvement of Brush College Road over Faries Parkway and the Norfolk Southern Railroad Tracks
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-269 Resolution Authorizing a Consolidated Rail Infrastructure and Safety Improvement Grant Agreement for Construction Engineering Services for the Improvement of Brush College Road over Faries Parkway and the Norfolk Southern Railroad Tracks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2024 2:37:11 PM
Creation date
12/3/2024 2:36:57 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-269
Res Ord Title
R2024-269 Resolution Authorizing a Consolidated Rail Infrastructure and Safety Improvement Grant Agreement for Construction Engineering Services for the Improvement of Brush College Road over Faries Parkway and the Norfolk Southern Railroad Tracks
Department
Public Works
Approved Date
7/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> � U.S.Department of Transportation <br /> ew Federal Railroad Administration <br /> (4) if applicable, provides the Recipient an opportunity to cure the noncompliance <br /> or take corrective action. <br /> (b) Response to Notice of Proposed Determination.The Recipient may, not later than 7 <br /> days after receiving the notice of proposed determination of noncompliance, respond to <br /> that notice in the form and through the process described in that notice. In its response, <br /> the Recipient may: <br /> (1) accept the proposed remedy; <br /> (2) acknowledge the noncompliance, but propose an alternative remedy; <br /> (3) acknowledge the noncompliance and agree to cure or take corrective action; <br /> or <br /> (4) dispute the noncompliance. <br /> To dispute the noncompliance, the Recipient must include in its response sufficient <br /> documentation or other information supporting the Recipient's compliance. <br /> (c) Notice of Final Determination. After considering the Recipient's response or failure to <br /> timely respond under Section 9.1(b)of this Attachment 1, FRA will make a final <br /> determination.To make a final determination, FRA must provide a written notice to the <br /> Recipient that: <br /> (1)states what the final determination is (e.g., noncompliance or compliance); <br /> (2)states the basis for the final determination; and <br /> (3) describes the remedy that FRA is imposing, if applicable, or if FRA is not <br /> imposing a remedy, describes the resolution to the proposed determination of <br /> noncompliance, including whether the Recipient has cured or corrected the <br /> noncompliance. <br /> (d) If FRA determines the noncompliance is one that cannot be addressed while work on <br /> the Project is ongoing, in the notice of proposed determination or in the notice of final <br /> determination, FRA will direct the Recipient to stop work.The Recipient will stop work and <br /> will direct any Subrecipients or contractors to stop work immediately upon receipt of a <br /> notice to stop work from FRA. <br /> (e) FRA may consider the public interest in making a determination of noncompliance and <br /> imposing a remedy. <br /> 9.2 Remedies <br /> (a) If FRA makes a final determination of noncompliance under Section 9.1(c)of this <br /> Attachment 1, FRA may impose a remedy, including: <br /> (1) additional conditions on the award; <br /> (2) requiring the Recipient to prepare and implement a corrective action plan; <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.