Laserfiche WebLink
RESOLUTION NO.RJ-a'-1-3Z-0 <br /> RESOLUTION AUTHORIZING ACCEPTANCE OF OTHER ASSOCIATED COSTS TO <br /> INSTALL FIBER CONDUIT UNDER LAKE DECATUR AT LOST BRIDGE ROAD <br /> WHEREAS,the City owns,manages and maintains a 144-strand fiber infrastructure <br /> providing high speed telecommunications to the community; and, <br /> WHEREAS,the fiber infrastructure provides reliable communications and connectivity <br /> to units of local government, educational facilities, state of Illinois agencies,museums, local <br /> businesses and other facilities; and, <br /> WHEREAS,the City continues to expand its fiber communications network throughout <br /> Decatur in its goal of providing access to all parts of the community; and, <br /> WHEREAS,The Sanitary District of Decatur, IL(SDD) is installing a 14-inch Forced <br /> Main pipe under Lake Decatur at Lost Bridge Road; and, <br /> WHEREAS,the City desires to use the same route SDD is utilizing for their 14-inch pipe <br /> install by piggy backing our 2-inch fiber conduit to it; and, <br /> WHEREAS,The city desires to utilize Bodine Electric for the additional work required <br /> who has been a provider and installer of fiber infrastructure in the City; and, <br /> WHEREAS,there exists a need for additional extensions of the fiber communications <br /> network to the east side of the City to provide fiber access to a firehouse,several schools, and <br /> other entities; and, <br /> WHEREAS,Bodine Electric is currently able to secure favorable prices and quick turn <br /> around on conduit and other materials needed for this fiber infrastructure extension; and, <br /> WHEREAS,the City desires to expedite the installation and extension of the network to <br /> the area described above and enter into an agreement for such without putting the work out for <br /> bid due to the time constraints and favorable agreement on price with Bodine Electric; and, <br /> WHEREAS,it was determined that it was in the best interest of the City to coordinate <br /> this project with the SDD's forced sewer main replacement and save nearly$400,000 in costs. <br /> NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF <br /> DECATUR, ILLINOIS: <br />