My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-009 Resolution Authorizing a Sourcewell Contract for the Purchase of One (1) Grappler Truck
COD
>
City Clerk
>
RESOLUTIONS
>
2025
>
R2025-009 Resolution Authorizing a Sourcewell Contract for the Purchase of One (1) Grappler Truck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2025 10:04:07 AM
Creation date
1/23/2025 10:04:05 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2025-009
Res Ord Title
R2025-009 Resolution Authorizing a Sourcewell Contract for the Purchase of One (1) Grappler Truck
Department
Public Works
Approved Date
1/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prepared for: Prepared by: <br /> Edward Lesage Duane Schaefer <br /> E J EQUIPMENT TRANSCHICAGO TRUCK <br /> 6949 NORTH 300 EAST ROAD GROUP <br /> 776 N.YORK STREET <br /> MANTENO,IL 60950 ELMHURST,IL 60126 <br /> Phone:815468-0250 Phone:815-509-9079 <br /> Weight Weight <br /> Data Code Description Front Rear <br /> 432-003 RELAY VALVE WITH 5-8 PSI CRACK PRESSURE, <br /> NO REAR PROPORTIONING VALVE <br /> 480-088 WABCO SYSTEM SAVER HP WITH INTEGRAL <br /> AIR GOVERNOR AND HEATER <br /> 479-005 AIR DRYER MOUNTED INBOARD ON RH RAIL <br /> 460-1AU STEEL AIR TANKS MOUNTED AFT INSIDE <br /> AND/OR BELOW FRAME JUST FORWARD OF <br /> REAR SUSPENSION,NO TRIPLE OR TORPEDO <br /> TANKS <br /> 477-006 BW DV-2 AUTO DRAIN VALVE WITHOUT HEATER <br /> ON ALL TANK(S) <br /> 919-063 (1)QUICKFIT PROGRAMMABLE SOLENOID <br /> W/STATE RETENTION PLUMBED TO BACK OF <br /> CAB <br /> m, a <br /> 545-675 6750MM(266 INCH)WHEELBASE <br /> * 546-101 11132X3-1/2X10-15/16 INCH STEEL FRAME 430 150 <br /> (8.73MMX277.8MM/0.344X10.94 INCH)120KSI <br /> 547-001 1/4 INCH(6.35MM)C-CHANNEL INNER FRAME 220 430 <br /> REINFORCEMENT <br /> 552-009 3050MM(120 INCH)REAR FRAME OVERHANG <br /> 55W-011 FRAME OVERHANG RANGE:111 INCH TO 120 -100 450 <br /> INCH <br /> AC8-99D CALC'D BACK OF CAB TO REAR SUSP C/L(CA): <br /> 200.2 in <br /> AE8-99D CALCULATED EFFECTIVE BACK OF CAB TO <br /> REAR SUSPENSION C/L(CA): 197.2 in <br /> AE4-99D CALC'D FRAME LENGTH-OVERALL: 415.24 in <br /> FSS-OLH CALCULATED FRAME SPACE LH SIDE: 143.98 <br /> in <br /> FSS-0RH CALCULATED FRAME SPACE RH SIDE: 249.03 <br /> in <br /> 553-001 SQUARE END OF FRAME <br /> 550-001 FRONT CLOSING CROSSMEMBER <br /> 559-003 LIGHTWEIGHT HEAVY DUTY ALUMINUM ENGINE -12 <br /> CROSSMEMBER <br /> 561-001 STANDARD CROSSMEMBER BACK OF <br /> TRANSMISSION <br /> * 562-056 STANDARD MIDSHIP#1 CROSSMEMBER <br /> MOUNTED 41 INCHES BACK OF CAB <br /> 572-001 STANDARD REARMOST CROSSMEMBER <br /> 565-001 STANDARD SUSPENSION CROSSMEMBER <br /> Application Version 11.8.106 a 07/29/2023 9:50 PM <br /> EJ Equip TA Grappler 23 July <br /> Page 9 of 28 <br /> Freightliner reserves the right to change specifications,prices,and weights,without notice. <br />
The URL can be used to link to this page
Your browser does not support the video tag.