My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-171 Resolution Authorizing a Construction Engineering Contract with Crawford, Murphy and Tilly for South Water Treatment Plant Electrical Improvements, City Project 2022-18
COD
>
City Clerk
>
RESOLUTIONS
>
2025
>
R2025-171 Resolution Authorizing a Construction Engineering Contract with Crawford, Murphy and Tilly for South Water Treatment Plant Electrical Improvements, City Project 2022-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:42:06 PM
Creation date
5/2/2025 1:04:33 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2025-171-
Res Ord Title
R2025-171 Resolution Authorizing a Construction Engineering Contract with Crawford, Murphy and Tilly for South Water Treatment Plant Electrical Improvements, City Project 2022-18
Department
City Manager
Approved Date
4/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
652
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RETURN WITH BID <br /> BID FORM <br /> ' For Construction of: SOUTH WTP ELECTRICAL IMPROVEMENTS <br /> ' IEPA LOAN NO.L17-2292 <br /> City Project No.: 2022-18 <br /> Owner: City of Decatur, Illinois <br /> Prospective Bidder: <br /> ' The undersigned Bidder, having examined the specifications, drawings and all other <br /> documents contained in the Contract Documents, and having examined the site where the work is <br /> ' being performed, and having familiarized themselves with any local conditions effecting the work <br /> and having knowledge of the cost of work at the place where the work is to be done, hereby <br /> proposes to execute and perform the formal Contract set forth in these Contract Documents, of <br /> which this Proposal forms a part, and will do the work therein described on the terms and <br /> ' conditions therein set forth; and furnish all required labor, materials, tools, equipment, <br /> transportation and services for said work, and pay all applicable taxes and other incidental costs, <br /> all in strict conformity with the drawings and specifications forming a part of the Contract <br /> ' Documents, for an amount computed upon the basis of the quantity of work actually performed at <br /> the bid prices noted below. <br /> ' It is understood that any listed quantities of work to be performed at unit prices are <br /> approximate only and are intended principally to serve as a guide in evaluating bids. <br /> It is further agreed that any quantities of work to be performed at unit prices and material <br /> to be furnished may be increased or decreased as may be considered necessary, in the opinion of <br /> the Owner,to complete the work fully as planned and contemplated and that all quantities of work, <br /> ' whether increased or decreased,are to be performed at the unit prices set forth in the Bid Proposal, <br /> except as provided for in the General Conditions. <br /> ' It is further agreed that any lump sum prices may be increased to cover additional work <br /> ordered by the Owner,but not shown on the plans or required by the specifications, in accordance <br /> with the provisions of the General Conditions. Similarly, they may be decreased to cover deletion <br /> ' of work so ordered. Where supplemental unit prices are available, they shall be used to adjust <br /> lump sum prices. <br /> I By submitting a bid, the Bidder acknowledges the understanding that the bid process is <br /> intended to serve the public interest in achieving the highest quality of services and goods <br /> at the lowest price, and that no right, interest, or expectation shall vest or inure to the benefit of <br /> ' Bidders as a result of any reliance or participation in the process. <br /> 1 <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.