Laserfiche WebLink
I <br /> I <br /> b. What is the City's expectation of what will be required to demonstrate a <br /> I Good Faith Effort? <br /> The City regards a good faith effort, at a minimum, to include direct <br /> contacts with 2-3 MBE subcontractors for each subcontracting opportunity <br /> I until the goal is met. The contacts must be with subcontractors that provide <br /> the type of work that is being subcontracted. Mass e-mail contacts alone <br /> are not considered a good faith effort. Documented follow up requests are <br /> I required if no response is received. The bidder is to provide all work, all <br /> contacts, the method of contact (email,phone,personal, etc.), and the <br /> results of each contact. Email requests with no reply or other evidence of <br /> Idirect contact are not considered to be acceptable direct contacts. <br /> City staff can have no contact with bidders regarding their bid submittal <br /> I after bids have been opened, so their only opportunity to demonstrate a <br /> good faith effort, is to provide all supportive evidence with the bid <br /> document. For the benefit of the review that must be conducted by City <br /> I staff, it is helpful for the bidders to group their direct contacts according to <br /> the subcontracting opportunity. <br /> 11c. If a proposal or bid for a public works contract meets or exceeds twenty <br /> percent(20%) of the total dollar amount of the contract, the City will <br /> award a two percent (2%)bonus of up to a maximum of fifty thousand <br /> I <br /> dollars ($50,000). Payment of this extra amount or bonus will be made at <br /> the end of the contract and after the City has verified and documented that <br /> MBE expenditures met or exceeded twenty percent(20%) of total contract <br /> value. <br /> I <br /> 2. Minority Workers Goal: 18%total hours worked should be performed by <br /> minority workers. <br /> I <br /> a. The City tracks this goal through forms provided by the City, a copy is <br /> located within the special provisions. Prevailing wage reports are not <br /> required to be submitted when the Prevailing wage act reporting is <br /> 11 I <br /> provided. <br /> lviii. SEQUENCE OF CONSTRUCTION — Existing Water Treatment Plant that must stay in <br /> service. <br /> I IX. CONTRACT TIME — Substantial completion is June 4, 2027 and ALL work shall be <br /> completed by July 2, 2027 <br /> X. PROJECT QUESTIONS —All questions on the plans and specifications should be directed <br /> to the City in writing by emailing them to capitalprojects@decaturil.gov Questions received <br /> less than 5 days prior to the bid opening will not be answered as to give sufficient time to <br /> address items by addendum, if required. <br /> 1 <br /> I <br />