My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-171 Resolution Authorizing a Construction Engineering Contract with Crawford, Murphy and Tilly for South Water Treatment Plant Electrical Improvements, City Project 2022-18
COD
>
City Clerk
>
RESOLUTIONS
>
2025
>
R2025-171 Resolution Authorizing a Construction Engineering Contract with Crawford, Murphy and Tilly for South Water Treatment Plant Electrical Improvements, City Project 2022-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 2:42:06 PM
Creation date
5/2/2025 1:04:33 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2025-171-
Res Ord Title
R2025-171 Resolution Authorizing a Construction Engineering Contract with Crawford, Murphy and Tilly for South Water Treatment Plant Electrical Improvements, City Project 2022-18
Department
City Manager
Approved Date
4/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
652
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ICITY OF DECATUR, IL WTP <br /> SOUTH WTP ELECTRICAL IMPROVEMENTS <br /> I <br /> TABLE OF CONTENTS <br /> 1 SECTION SECTION <br /> NUMBER TITLE PAGE NUMBER <br /> I00 01 07 Professional Seals 00 01 07 1 <br /> ii <br /> 111 BIDDING AND CONTRACTING REQUIREMENTS <br /> City of Decatur Project Manual 1-142 <br /> IDIVISION 01 —GENERAL CONDITIONS <br /> 01 01 10 Site Conditions 01 01 10 1-2 <br /> I 01 11 00 Summary of Project 01 11 00 1-7 <br /> 01 20 00 Payment Procedures 01 20 00 1-3 <br /> 01 21 10 Allowances 01 21 10 1-2 <br /> I 01 25 13 Product Substitution Procedures 01 25 13 1-4 <br /> 01 26 00 Contract Modification Procedures 01 26 00 1-4 <br /> 01 31 50 Mechanical and Electrical Coordination 01 31 50 1-7 <br /> 01 32 01 Construction Schedules 01 32 01 1-2 <br /> I01 33 00 Submittal Procedures 01 33 00 1-8 <br /> 01 35 26 Safety Requirements and Protection of Property 01 35 26 1-3 <br /> 01 42 20 Abbreviations 01 42 20 1-6 <br /> I 01 43 50 Manufacturers Services 01 43 50 1-2 <br /> 01 45 00 Quality Requirements 01 45 00 1-5 <br /> 01 50 00 Temporary Construction Facilities and Controls 01 50 00 1-5 <br /> I 01 51 13 Temporary Power 01 51 13 1-2 <br /> 01 52 50 Field Offices 01 52 50 1-4 <br /> 01 58 00 Easements and Permits 01 58 00 1-65 <br /> I 01 60 00 Product Requirements 01 60 00 1-3 <br /> 01 70 00 Cleaning 01 70 00 1-4 <br /> 01 72 50 Field Engineering 01 72 50 1-2 <br /> I 01 75 00 Starting and Adjusting 01 75 00 1-2 <br /> 01 78 00 Closeout Procedures 01 78 00 1-5 <br /> 01 78 10 Project Record Documents 01 78 10 1-3 <br /> 01 78 23 Operation and Maintenance Manuals 01 78 23 1-5 <br /> II01 79 00 Demonstration and Training 01 79 00 1-5 <br /> 01 91 00 Commissioning 01 91 00 1-3 <br /> I <br /> I <br /> I <br /> Decatur/22004272-00 South WTP Electrical Improvements <br /> 1 TOC-i Master TOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.