Laserfiche WebLink
SPECIFIC WORK OUTLINE <br /> 1.0 SIDING-HOUSE <br /> Removal of existing siding field verify size. Install 8" double 4"Vinyl siding to all areas of <br /> insulation and or Tyvek to include entire house. Include all accessories of one piece outside <br /> and inside corners,j-channels, starter strips etc. Contractor is responsible for removal and <br /> disposal of existing tear out. <br /> $ Material $ Labor $ Total <br /> 2.0 Front Porch <br /> Replace front porch decking, supports, handrails, and steps. Follow all current city building <br /> codes for the front porch. <br /> $ Material $ Labor $ Total <br /> 3.0 Site prep—Dumpster <br /> Trash removal <br /> $ Material $ Labor $ Total <br /> Optional work <br /> TOTAL COST OF MATERIAL <br /> TOTAL COST OF LABOR $ <br /> TOTAL COST OF PROJECT $ <br /> TOTAL COST OF PROJECT AND OPTIONAL WORK $ <br /> Approved Signature <br /> Contractor <br />