My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-267 Resolution Accepting the Bid and Authorizing the Execution of an Agreement with Precision Pro LLC for the Residential Exterior Improvements at 1037 W. Wood St.
COD
>
City Clerk
>
RESOLUTIONS
>
2025
>
R2025-267 Resolution Accepting the Bid and Authorizing the Execution of an Agreement with Precision Pro LLC for the Residential Exterior Improvements at 1037 W. Wood St.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 4:45:42 PM
Creation date
10/20/2025 4:45:41 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2025-267
Res Ord Title
R2025-267 Resolution Accepting the Bid and Authorizing the Execution of an Agreement with Precision Pro LLC for the Residential Exterior Improvements at 1037 W. Wood St.
Department
Econ and Com Dev
Approved Date
9/15/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFIC WORK OUTLINE <br /> 1.0 Roofing-Gutters <br /> Install 5" Seamless gutters to include 2x3 downspouts installed with a fall of 1/16" at lowest <br /> corners of each straight run. Approximately 300LF. Field verify. Install new gutter guards in all <br /> gutters. <br /> Gutters are to include guards <br /> $ Material $ Labor $ Total <br /> 2.0 Soffit and Fascia <br /> Removal of existing soffit and fascia. Install new soffit and fascia to all areas of eves and gutters <br /> to include entire perimeter house. Include all accessories of one piece outside and inside <br /> corners etc. Contractor is responsible for removal and disposal of existing tear out. <br /> $ Material $ Labor $ Total <br /> 3.0 Site prep—Dumpster <br /> Trash removal <br /> $ Material $ Labor $ Total <br /> Optional work <br /> 1.0 SIDING-HOUSE <br /> Removal of existing siding field verify size. Install 8" double 4" Vinyl siding to all areas of <br /> insulation and or Tyvek to include entire house. Include all accessories of one piece outside <br /> and inside corners,j-channels, starter strips etc. Contractor is responsible for removal and <br /> disposal of existing tear out. <br /> $ Material $ Labor $ Total <br /> 2.0 Windows—Aluminum wrap <br /> Aluminum wrap all windows, caulk and seal all joints. <br /> $ Material $ Labor $ Total <br /> TOTAL COST OF MATERIAL $ <br />
The URL can be used to link to this page
Your browser does not support the video tag.