My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2025-270 Resolution Accepting the Bid and Authorizing the Execution of an Agreement with Precision Pro LLC for the Residential Exterior Improvements at 2270 N. Main St.
COD
>
City Clerk
>
RESOLUTIONS
>
2025
>
R2025-270 Resolution Accepting the Bid and Authorizing the Execution of an Agreement with Precision Pro LLC for the Residential Exterior Improvements at 2270 N. Main St.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 4:49:39 PM
Creation date
10/20/2025 4:49:38 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2025-270
Res Ord Title
R2025-270 Resolution Accepting the Bid and Authorizing the Execution of an Agreement with Precision Pro LLC for the Residential Exterior Improvements at 2270 N. Main St.
Department
Econ and Com Dev
Approved Date
9/15/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFIC WORK OUTLINE <br /> 1.0 Roof—asphalt shingles <br /> Perform complete tear off all existing layers of roofing materials down to the sheathing. Inspect <br /> existing roof sheathing and rafters, identify deteriorating sheathing and or rafters and seek <br /> Project Manager's approval to remove them. Replacement sheathing should match existing <br /> thickness. Install ice and water barrier, drip edge, flashing. 225 LB felt (minimum)/adhesive roof <br /> underlayment and architectural shingles. Field verify. Contractor is responsible for removal and <br /> disposal of existing tear out <br /> $ Material $ Labor $ Total <br /> 2.0 Roofing — Gutters <br /> Install 5" Seamless gutters to include 2x3 downspouts installed with a fall of 1/16" at lowest <br /> corners of each straight run. Approximately 300LF. Field verify. Install new gutter guards in all <br /> gutters. <br /> Gutters are to include guards <br /> $ Material $ Labor $ Total <br /> 4.0 Site prep — Dumpster <br /> Trash removal <br /> $ Material $ Labor $ Total <br /> Optional work <br /> 1.0 SIDING-HOUSE <br /> Removal of existing siding field verify size. Install 8" double 4" Vinyl siding to all areas of <br /> insulation and or Tyvek to include entire house. Include all accessories of one piece outside <br /> and inside corners, j-channels, starter strips etc. Contractor is responsible for removal and <br /> disposal of existing tear out. <br /> $ Material $ Labor $ Total <br /> 2.0 Windows —Aluminum wrap <br /> Aluminum wrap all windows, caulk and seal all joints. <br /> $ Material $ Labor $ Total <br />
The URL can be used to link to this page
Your browser does not support the video tag.