Laserfiche WebLink
At a minimum,all quotes should include costs for mobilization, dirt work,equipment(owned or rented), <br /> fuel,and personnel.Detailed quantities and specifications are included within the attached plans. This list <br /> is for reference only. Lake Decatur Watershed Farmland Conservation Program staff shall provide basic <br /> line,grade, and benchmark staking for construction. <br /> To maintain competitive quotes, please do not include extra items without consulting with, or getting <br /> clarification from, Lake Decatur Watershed Farmland Conservation Program staff. <br /> Anticipated Items to be Included or Considered in Quotes <br /> *Itemizing of quotes is not necessary. <br /> ®Seeding ❑Diverter <br /> ►�Broadcast ❑Drill ❑Trash/Debris Racks <br /> ®Seed ®Landscape Fabric <br /> @ Contractor ❑Owner ❑Tree Clearing <br /> ❑Bedding/Mulch/Straw ❑Brush Piling <br /> ®Seed Bed Prep(Tiller) ❑Root Ball Disposal(Bury) <br /> ►Z�Silt Fence ❑Root Rake <br /> ®Field Tile Installed ❑Rock Rake <br /> ❑Field Tile Repaired(Known Tile Holes) ODebris Removal (Scrap Metal, Trash,etc.) <br /> ®Tile Risers ®Dirt Spoils <br /> ®Rock ❑Stockpiled ®Spread&Level <br /> ❑Metal Pipe CI Other(See Notes Below) <br /> Additional Notes: <br /> Please list seeding cost separately. <br /> SEEDING COST IS $2,000.00 <br /> THIS AMOUNT IS INCLUDED IN OUR TOTAL PROPOSAL AMOUNT <br /> Total Amount of Proposal $ 24,650.00 <br /> Please return a copy of this form with your quote,which may be included here,or attached separately <br /> on your company's letterhead. Thank you for your interest in working with the Lake Decatur <br /> Watershed Farmland Conservation Program. <br /> 2 of 2 <br />