Laserfiche WebLink
EXHIBIT A <br /> 1845 N.22nd St. • P.O.Box 976 • Decatur,IL • 62525 • <br /> (217)429-6868 <br /> PROPOSAL NO. JP251008-174 <br /> PROJECT City of Decatur - Civic Center EV Chargers <br /> 10/27/2025 <br /> Lacie Elzy <br /> Transportation <br /> Service Director <br /> City of Decatur <br /> Electrical Service Company proposes to furnish all supervision, labor, materials and tools for the <br /> electrical installation for the above referenced project. <br /> This proposal will be held good until end of business on 11/28/2025. Please review the following scope of <br /> work, clarifications/exceptions,exclusions and other conditions. <br /> This proposal is based on our understanding of the electrical installation gathered from direct <br /> communication and material pricing on 10/20/2025. <br /> This proposal is subject to sections A, B,C and D listed below. <br /> SECTION A-SCOPE OF WORK <br /> 1. Provide the equipment for a new 400-amp service to supply the chargers. <br /> 2. Install the underground conduit and wire for the service to the Ameren pole location. <br /> 3. Install all underground conduit and wire to each charger locations. <br /> 4. Install the needed concrete bases for each charger. <br /> 5. Provide and install two(2) level 3 chargers. <br /> 6. Make all wiring termiantions. <br /> 7. Test all power and label. <br /> 8. Install protective bollards as needed to protect the new equipment. <br /> SECTION B-CLARIFICATIONS/EXCEPTIONS <br /> 1. The electrical permit has had the permit fee waved for this project. <br /> 2. We have deducted the Ameren incentive amount of$22,536.00 from our proposal. This was <br /> an estimated <br /> amount"up to"the amount listed. <br /> 3. All programming is included in this price. The Charge Point technian will assist in the <br /> initial set up of the chargers. <br /> 4. We will coordinate all utility power connections with Ameren. <br /> 5. We recommend the City of Decatur install a lock on the electrical panel to <br /> prevent the public from accessing the electrical panel. <br /> 6. Tax has been withheld from this project,we will need the tax exemption certificate. <br />