Laserfiche WebLink
as listed on the Plan Holder List. Questions received five(5)business days before the bid <br /> opening shall be answered. Questions received between four(4) and two(2)business days before <br /> the bid opening may be answered provided that a means exists to communicate the answer in <br /> writing to all the bidders. Questions received one (1)business day before or on the day of the bid <br /> opening shall not be answered.Answers to questions should be distributed to bidders by email, <br /> however if a bidder does not have email service the documents may be transmitted by fax. <br /> 6. Tabulate and Evaluate Bids,Recommend Award. Prepare and provide to the City's <br /> Representative a bid tabulation which shall consist of a listing of all pay items in the contract <br /> documents, a listing of the Consulting Engineer's Opinion of Probable Costs,and a listing of the <br /> bids for each of the pay items submitted by each of the bidders. The Consulting Engineer shall <br /> tabulate the bids on an electronic spreadsheet form provided by the City's Representative. The <br /> Consulting Engineer shall assist the City's Representative in evaluating bids or proposals and in <br /> assembling and awarding contracts. The Consulting Engineer shall check the bidder's references <br /> and performance on prior projects. Based on the Consulting Engineer's evaluation of the bids <br /> and the qualifications of the bidders.the Consulting Engineer shall provide to the City's <br /> Representative a written recommendation for award of the contract to one of the bidders or <br /> recommend other action as may be appropriate. The final selection of the Construction Contractor <br /> is the sole responsibility of the City Council. <br /> 7. Completion Time. Complete the bidding phase and prepare and submit the recommendation to <br /> the City's Representative for the award of the Contract(s)within the time period set forth in <br /> Exhibit C,Project Timeline. <br /> SECTION III. CITY'S RESPONSIBILITIES <br /> The City shall. <br /> A. FURNISH REQUIREMENTS AND LIMITATIONS. Provide all criteria and full information as <br /> to the City's requirements for the Project. including design objectives and constraints, space, capacity <br /> and performance requirements, flexibility and expandability. economic parameters and any budgetary <br /> limitations; and furnish copies of all design and construction standards which the City will require to <br /> be included in the Drawings and Specifications. <br /> B. FURNISH INFORMATION. Assist the Consulting Engineer by placing at the Consulting <br /> Engineer's disposal all available information pertinent to the Project including previous reports and <br /> any other data relative to design or construction of the Project. <br /> C. FURNISH TECHNICAL INFORMATION. Furnish to the Consulting Engineer, as required for <br /> performance of the Consulting Engineer's Basic Services(except to the extent provided otherwise in <br /> Exhibit A, "Scope of Work"), data prepared by or services of others, including without limitation, <br /> core borings.probings and subsurface explorations,hydrographic surveys, laboratory tests and <br /> inspections of samples. materials and equipment; appropriate professional interpretations of all of the <br /> foregoing; environmental assessment and impact statements;property,boundary, easement, right-of- <br /> way, topographic and utility surveys;property descriptions; zoning, deed and other land use <br /> restriction; all of which the Consulting Engineer may rely upon in performing the Consulting <br /> Engineer's services. <br /> D. SURVEYS AND REFERENCE POINTS. Provide field control surveys and establish reference <br /> points and base lines except to the extent provided otherwise in Section II to enable the Contractor(s) <br /> to proceed with the layout of the work. <br /> 5 <br /> Last Revised:2.0312022 <br />