Laserfiche WebLink
RESOLUTION NO. alp N C1 <br /> RESOLUTION AUTHORIZING A PROFESSIONAL ENGINEERING SERVICES <br /> AGREEMENT WITH CRAWFORD, MURPHY AND TILLY,INC.,TO PROVIDE <br /> FINAL DESIGN ENGINEERING SERVICES FOR THE LOST BRIDGE NORTH BASIN <br /> AND FLORIAN BASIN INFLOW AND INFILTRATION REDUCTION PROJECT. <br /> CITY PROJECT 2017-02 <br /> BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DECATUR, <br /> ILLINOIS: <br /> Section 1. That the Professional Services Agreement to provide final design engineering <br /> services for the Lost Bridge North Basin and Florin Basin Inflow and Infiltration Reduction <br /> Project,presented to the Council herewith as Exhibit 1 and made a part hereof,between the City <br /> of Decatur and Crawford, Murphy, and Tilly, Inc., and the same is hereby received,placed on <br /> file and approved. <br /> Section 2. That the Mayor and City Clerk be, and they are hereby, authorized and <br /> directed to execute said Agreement between the City of Decatur, Illinois and Crawford, Murphy, <br /> and Tilly, Inc., for a fee not to exceed$1,229,952. <br /> PRESENTED and ADOPTED this 2nd day of March 2026. <br /> ia-L-41 <br /> ulie Moore Wolfe, Mayor <br /> Attest: <br /> 411111116, <br /> poi& <br /> im Althoff, City Clerk <br />