My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-58 Resolution Authorizing Lake Decatur Watershed Farmland Conservation Program Agreement for Floodplain Reconnection Wetlands with Lawrence H. Shackelford Trust
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-58 Resolution Authorizing Lake Decatur Watershed Farmland Conservation Program Agreement for Floodplain Reconnection Wetlands with Lawrence H. Shackelford Trust
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2026 1:21:31 PM
Creation date
3/19/2026 1:21:28 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-58
Res Ord Title
R2026-58 Resolution Authorizing Lake Decatur Watershed Farmland Conservation Program Agreement for Floodplain Reconnection Wetlands with Lawrence H. Shackelford Trust
Department
Public Works
Approved Date
3/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( ,SD, United States Natural Resources Conservation Service <br /> Department of <br /> Agriculture <br /> Operation & Maintenance Plan <br /> Constructed Wetland(Code 656) <br /> Landowner/Operator: Date <br /> NRCS Service Center Conservation District <br /> Practice Location: Tract/Field ID: <br /> (Lat/Long or UTM Coord, or Sec/TS/R) <br /> Expected Lifespan <br /> The minimum expected lifespan of this practice is at least 15 years <br /> Follow the operation and maintenance plan below to establish wetland plants and keep your <br /> constructed wetland functioning as intended: <br /> • Establishing wetland plants using the Transplanting method: <br /> • When construction of the wetland is completed, keep the wetland dry(water control structure <br /> open) until after the basin is planted with emergent herbaceous macrophytes in the spring. <br /> • For the first year after planting,adjust the water control structure(s)so that the topsoil is kept <br /> moist to saturated with fresh water,up to a maximum of 1 inch of ponded water, for the first <br /> growing season or until 75%of the plants in the wetland pool area show new growth. <br /> • Then gradually increase the water level to the normal operating level as the wetland plants <br /> mature, always leaving a minimum of 4 to 6 inches of plant tops out of the water. <br /> • After the permanent pool water depth has been reached, the constructed wetland is ready for <br /> normal operation. <br /> • After the first growing season, if there is an area larger than 20%of the wetland without <br /> satisfactory vegetation,then that part of the wetland should be replanted. <br /> • Establishing wetland plants using the Seeding method: <br /> • For the first year after seeding, adjust the water control structure(s)so that the topsoil is kept <br /> moist to saturated with fresh water,up to a maximum of 1 inch of ponded water. <br /> • Then gradually increase the water level to the normal operating level as the wetland plants <br /> mature,always leaving a minimum of 4 to 6 inches of plant tops out of the water. <br /> • After the permanent pool water depth has been reached, the constructed wetland is ready for <br /> normal operation <br /> • After the first growing season, if there is an area larger than 20%of the wetland without <br /> satisfactory vegetation,contact NRCS for assistance with a revegetation plan. <br /> • Establishing wetland plants using the Natural Regeneration method: <br /> • For the first year after construction,adjust the water control structure(s)so that the topsoil is <br /> kept moist to saturated with fresh water,up to a maximum of 1 inch of ponded water. <br /> • Then gradually increase the water level to the normal operating level as the wetland plants <br /> mature,always leaving a minimum of 4 to 6 inches of plant tops out of the water. <br /> • After the permanent pool water depth has been reached,the constructed wetland is ready for <br /> normal operation. <br /> • After the first growing season,if there is an area larger than 20%of the wetland without <br /> satisfactory vegetation,contact NRCS for assistance with a revegetation plan. <br /> • Lock structures when not in use to prevent tampering and or vandalism. <br /> • Inspect after significant storm events and at least twice a year to identify repair and maintenance <br /> needs. <br /> • Inspect the downstream face of embankments annually Wet areas,indicated by seeps,wetland <br /> plants or unusually vigorous vegetation the downstream face of an embankment could indicate a <br /> NRCS, IL O&M-Page 1 of 3 May 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.