My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-54 Resolution Accepting the Bid and Authorizing the Execution of a Contract with A&R Mechanical Services dba A&R Services Inc., for the South Taylorville Road Water Main Replacement Project, City Project 2024-16
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-54 Resolution Accepting the Bid and Authorizing the Execution of a Contract with A&R Mechanical Services dba A&R Services Inc., for the South Taylorville Road Water Main Replacement Project, City Project 2024-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2026 11:08:53 AM
Creation date
3/19/2026 2:17:05 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-54
Res Ord Title
R2026-54 Resolution Accepting the Bid and Authorizing the Execution of a Contract with A&R Mechanical Services dba A&R Services Inc., for the South Taylorville Road Water Main Replacement Project, City Project 2024-16
Department
Public Works
Approved Date
3/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> South Taylorville Road Water Main Replacement Project <br /> ' City Project 2024-16 <br /> February 27, 2026 <br /> ADDENDUM NO. 2 <br /> TO PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR: <br /> ' SOUTH TAYLORVILLE ROAD WATER MAIN REPLACEMENT PROJECT <br /> CITY PROJECT 2024-16 <br /> ' DATED FEBRUARY 2026 <br /> AD-2-1 NOTICE <br /> 1 1.01 This Addendum No. 2 dated February 27,2026 to the Plans, <br /> Specifications and Contract Documents for the above captioned <br /> ' project, supersedes all contrary and conflicting information of the <br /> above-mentioned bid proposal documents, which are hereby <br /> supplemented in certain particulars as follows: <br /> ' AD-2-2 CONTRACTOR QUESTION <br /> ' Q: Is Bedding required for Ductile Iron Piping? <br /> A: Bedding of Ductile Iron Piping is required as shown per the standard <br /> trench backfill and bedding details on sheet 28. <br /> ' Q: Under various pay items Isolation Valves are listed as possible. Does this <br /> cost need to be added to the corresponding pay item, or will the <br /> ' Isolation Valve be paid by the corresponding isolation valve pay <br /> item? <br /> A: All pay items that reference an isolation valve in their work description <br /> shall include the cost of any isolation valve necessary to complete the <br /> associated work. Line Stop pay items apply only to the locations <br /> shown on the plans. Any temporary plugging of the existing water <br /> main required for staging or to facilitate installation shall be <br /> ' incidental to the appropriate pay item. <br /> Q: Does the Water Service pay item include payment of curb&gutter, <br /> pavement removal and replacement and trench backfill, or will those <br /> items be paid under their respective bid item? <br /> A: SP-50 through SP-57 Water Services, specify all items included in the pay <br /> item. Surface removal and replacement, as well as trench backfill, are <br /> identified on the plans. If the Contractor chooses to remove additional <br /> pavement, curb and gutter, sidewalk, or any other surface feature <br /> ' beyond what is shown on the plans for water service replacement,the <br /> removal and replacement of those items shall be the Contractor's <br /> responsibility and will be considered included in the water service <br /> ' replacement cost, with no separate payment. This requirement also <br /> applies to trench backfill associated with the water service installation <br /> that lies outside of the water main trench. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.