Laserfiche WebLink
' RETURN WITH BID <br /> 75 Z0013798 CONSTRUCTION LAYOUT SumLump 15,390.65 15,390.65 <br /> L <br /> Lump <br /> 76 70100010 TRAFFIC CONTROL Sum 1 58,017.52 58,017.52 <br /> ' 77 67100100 MOBILIZATION Lump 72,079.24 72,079.24 <br /> Sum <br /> ' ALTERATIONS, CANCELLATIONS, 350,000.00 <br /> AA EXTENSIONS, DEDUCTIONS AND EXTRA EACH 1 $350,000 <br /> WORK <br /> ' TOTAL BASE BID 2,697,720.00 <br /> TOTAL BASE BID IN WORDS <br /> ' Two Million Six Hundred Ninety Seven Thousand Seven Hundred Twenty Dollars and 00/100 <br /> The BIDDER agrees to accept as full payment for the work proposed as an additive or deductive <br /> ' alternate under this project as herein specified and as shown on the Drawings, based upon the <br /> undersigned's own estimate of quantities and costs and the following Alternate Bid Item Price. The <br /> BIDDER agrees that the alternate bid item price represents a true measure of the labor and materials <br /> ' required to perform the Work, including all allowances for overhead and profit for each type and unit <br /> of work called for in these Contract Documents. <br /> ' Additive or Deductive Alternate Bid prices are not to be included in the Total Lump Sum Bid Amount. <br /> The Owner may or may not accept any or all of the Additive or Deductive alternate bid items. with the <br /> base bid work at the owner's sole discretion. <br /> r <br /> I <br /> I <br /> i <br /> 1 22 <br />