Laserfiche WebLink
IRETURN WITH BID <br /> I 103 28000500 INLET AND PIPE PROTECTION Ea 3 167.19 501.57 <br /> 104 25000210 SEEDING Acre 0.15 11,333.33 1,700.00 <br /> I <br /> 105 25100115 MULCH, METHOD 2 (2 Tons/acre) Tons 0.30 2,666.67 800.00 <br /> 106 X0327678 EXPLORATION EXCAVATIONS Ea 1 1,228.19 1,228.19 <br /> I107 Z0013798 CONSTRUCTION LAYOUT LuSumm 1 7,062.13 7,062.13 <br /> I108 70100010 TRAFFIC CONTROL Sump 1 11,003.70 11,003.70 <br /> TOTAL ALTERNATE 1 BID 840,495.00 <br /> I <br /> TOTAL ALTERNATE 1 BID IN WORDS <br /> IEight Hundred Forty Thousand Four Hundred Ninety Five Dollars and 00/100 <br /> I <br /> III <br /> I <br /> I <br /> I <br /> 11 <br /> I <br /> I <br /> I <br /> I <br /> I 24 <br />