My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-72 Resolution Authorizing a Professional Engineering Services Agreement with Clark Dietz, Inc., to Provide Construction Engineering Services for the Northeast Water Main Extension Project – Boyd Road to North Of Cundiff Road, City Project
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-72 Resolution Authorizing a Professional Engineering Services Agreement with Clark Dietz, Inc., to Provide Construction Engineering Services for the Northeast Water Main Extension Project – Boyd Road to North Of Cundiff Road, City Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2026 2:45:58 PM
Creation date
4/24/2026 2:45:57 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-72
Res Ord Title
R2026-72 Resolution Authorizing a Professional Engineering Services Agreement with Clark Dietz, Inc., to Provide Construction Engineering Services for the Northeast Water Main Extension Project – Boyd Road to North Of Cundiff Road, City Project
Department
Public Works
Approved Date
4/6/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Consulting Engineer Not Responsible for Acts of Contractor. The Consulting Engineer shall not <br /> be responsible for the supervision or control of the acts or omissions or construction means, <br /> methods or techniques of any Contractor, or Subcontractor, or any of the Contractor(s)'or <br /> Subcontractors' agents or employees or any other person(except the Consulting Engineer's own <br /> employees and agents)at the site or otherwise performing any of the Contractor(s)'work; <br /> however, nothing contained in this contract shall be construed to release the Consulting Engineer <br /> from liability for failure to properly perform duties undertaken by him in these Contract <br /> Documents or this Agreement. <br /> 12. Preparation of Record Drawings. The Consulting Engineer shall prepare a set of record plans on <br /> which shall be noted all changes which may have occurred during construction. The record <br /> drawings need not detail changes in measurements, elevation lines or grades which are within the <br /> normally accepted construction tolerances. Record drawings may be prepared using AutoCAD or <br /> other electronic plan preparation method. Alternately,record drawings may be prepared using <br /> manual methods. The plans shall be delivered to the City's Representative in the form of one set <br /> of prints and electronic file if record drawings were prepared by electronic methods. The cost of <br /> document reproduction shall be considered to be a reimbursable expense and paid in accordance <br /> with Section V(C)of this agreement. <br /> 13. Completion Time. The Consulting Engineer shall complete the Construction Inspection Phase <br /> within the time period set forth in Exhibit C, Project Timeline. <br /> SECTION III. CITY'S RESPONSIBILITIES <br /> The City shall, <br /> A. FURNISH REQUIREMENTS AND LIMITATIONS. Provide all criteria and full information as <br /> to the City's requirements for the Project, including design objectives and constraints,space, capacity <br /> and performance requirements, flexibility and expandability, economic parameters and any budgetary <br /> limitations;and furnish copies of all design and construction standards which the City will require to <br /> be included in the Drawings and Specifications. <br /> B. FURNISH INFORMATION. Assist the Consulting Engineer by placing at the Consulting <br /> Engineer's disposal all available information pertinent to the Project including previous reports and <br /> any other data relative to design or construction of the Project. <br /> C. FURNISH TECHNICAL INFORMATION. Furnish to the Consulting Engineer, as required for <br /> performance of the Consulting Engineer's Basic Services(except to the extent provided otherwise in <br /> Exhibit A, "Scope of Work"), data prepared by or services of others,including without limitation, <br /> core borings, probings and subsurface explorations,hydrographic surveys, laboratory tests and <br /> inspections of samples, materials and equipment;appropriate professional interpretations of all of the <br /> foregoing; environmental assessment and impact statements; property,boundary, easement,right-of- <br /> way, topographic and utility surveys; property descriptions; zoning,deed and other land use <br /> restriction; all of which the Consulting Engineer may rely upon in performing the Consulting <br /> Engineer's services. <br /> D. SURVEYS AND REFERENCE POINTS. Provide field control surveys and establish reference <br /> points and base lines except to the extent provided otherwise in Section II to enable the Contractor(s) <br /> to proceed with the layout of the work. <br /> 4 <br /> Last Revised:2/03/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.