My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2024-348 Resolution Authorizing a Behind the Meter Solar Project for the Decatur Public Library (2)
COD
>
City Clerk
>
RESOLUTIONS
>
2024
>
R2024-348 Resolution Authorizing a Behind the Meter Solar Project for the Decatur Public Library (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 8:36:50 AM
Creation date
5/6/2026 8:36:45 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2024-348
Res Ord Title
R2024-348 Resolution Authorizing a Behind the Meter Solar Project for the Decatur Public Library
Department
City Manager
Approved Date
11/18/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POWER PURCHASE AGREEMENT ("PPA") <br /> 6. Anticipated Condition Satisfaction Date: September 30, 2025 (estimated) <br /> 7. Anticipated Commercial Operations Date: October 31, 2025 (estimated) or following <br /> completion of Purchaser's Punchlist,whichever occurs later. <br /> 8. Contract Year:Twelve (12) months,the first of which begins the first day of the month following <br /> the Commercial Operation Date. <br /> 9. Rebate Variance: All prices in this Agreement are calculated based on an upfront rebate of <br /> $44,000(Ameren mails check to utility billing customer name on file, and Buyer signs over to <br /> Seller.). If the actual rebate is lower than calculated, prices will be adjusted pro-rata to reflect <br /> the actual rebate received. <br /> 10. Illinois Solar for All:All projects in Illinois Solar for All will be compliant with the program <br /> requirements including the ownership of environmental benefits and applicable mandatory <br /> terms and conditions in the consumer disclosure such as the option to cancel, late fees, etc. <br /> (Exhibit 8). If Illinois Solar for All cannot be utilized,then the Seller will provide a modified <br /> agreement consistent with Illinois Shines program. <br /> 11. System Installation: <br /> Includes: [x] Design,engineering, permitting, installation, monitoring, rebate application& <br /> paperwork processing of the system <br /> [x] Limited warranty <br /> [x] Any like substantive equipment, in the sole discretion of the Seller <br /> [x] State or utility rebate, if any. Describe:To Developer/Seller <br /> (Ameren mails check to utility billing customer name on file, <br /> which shall be signed over to Developer/Seller.) <br /> Excludes: Unforeseen groundwork(including but not limited to excavation/circumvention or <br /> underground obstacles), upgrades or repairs to the existing facility conditions for <br /> any repairs necessary to bring up to code or to repair any components in disrepair <br /> prior to any alterations related to the system or its interconnection,tree removal <br /> and trimming. <br /> Page 4 of 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.