Laserfiche WebLink
Comprehensive Plan Monthly Schedule (Cont.) <br /> February-27 March-27 April-27 May-27 June-27 July-27 August-27 <br /> Key Downtown Plan Downtown Plan Sub-Area Plan 2 Sub-Area Plan 4 Parks/Green Space Full Draft for Staff Full Draft <br /> Tasks Transportation Modeling Transportation Modeling Sub-Area Plan 3 Sub-Area Plan 5 Strategy Comment for PC Comment <br /> Vacant Land Strategy Sub-Area Plan 2 Pedestrian/Non-Motorized Emerging Transportation Infrastructure Upgrades <br /> Sub-Area Plan 3 Plan Technology Plan Plan <br /> Pedestrian/Non-Motorized Sub-Area Plan 4 Transit Plan Market Needs Analysis <br /> Plan Sub-Area Plan 5 Parks/Green Space Strategy Cross-Check <br /> Emerging Transportation Infrastructure Upgrades Plan Zoning Plan <br /> Technology Plan Market Needs Analysis Cross- Implementation Matrix <br /> Transit Plan Check <br /> Zoning Plan <br /> Virtual 2 Collaborations with Staff 2 Collaborations with Staff 2 Collaborations with Staff 2 Collaborations with Staff 1 Collaboration with Staff 1 Collaboration with Staff <br /> Meetings <br /> 1 Downtown Discussion 1 Transportation Discussion 1 Sub-Area Discussion 1 Implementation Plan <br /> with Steering Committee with Steering Committee with Steering Committee Discussion with Steering <br /> Committee <br /> In-Person FLU Presentation to City Transportation for the Future Sub-Area Plan Implementation Plan <br /> Meetings Plan Commission Presentation to City Plan Presentation to City Plan Presentation to City Plan <br /> Commission Commission Commission <br /> Deliverables Downtown Plan Revised Downtown Plan Revised Sub-Area Plan 2 Revised Sub-Area Plan 4(Word) Revised Parks/Green Full Draft for Staff Full Draft for PC <br /> Corridor Design Plan (Word) (Word) Revised Sub-Area Plan 5(Word) Space Strategy(Word) Comment(InDesign) Comment(InDesign) <br /> Vacant Land Strategy Revised Corridor Design Revised Sub-Area Plan 3 Revised Emerging Transportation Revised Infrastructure <br /> Revised Vacant Land Plan(Word) (Word) Technology Plan(Word) Upgrades Plan(Word) <br /> Strategy(Word) Draft Sub-Area Plan 2 Revised Pedestrian/Non- Revised Transit Plan(Word) Revised Market Needs <br /> Draft Downtown Plan (Word) Motorized Plan(Word) Draft Parks/Green Space Analysis Cross-Check <br /> (Word) Draft Sub-Area Plan 3 Draft Sub-Area Plan 4 Strategy(Word) (Word) <br /> Draft Transportation (Word) (Word) Draft Infrastructure Upgrades Revised Zoning Plan <br /> Modeling Report(Word) Draft Pedestrian/Non- Draft Sub-Area Plan Plan(Word) (Word) <br /> Motorized Plan(Word) 5(Word) Draft Market Needs Analysis <br /> Draft Emerging Cross-Check(Word) <br /> Transportation Technology Draft Zoning Plan(Word) <br /> Plan(Word) <br /> Draft Transit Plan(Word) <br /> MC KEN NA City of Decatur•Project Schedule Plan 1 5 <br />