My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-136 Resolution Authorizing Lake Decatur Watershed Farmland Conservation Program Agreement With Lynn Clarkson for a Bioreactor Drainage Water Treatment Structure
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-136 Resolution Authorizing Lake Decatur Watershed Farmland Conservation Program Agreement With Lynn Clarkson for a Bioreactor Drainage Water Treatment Structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2026 4:52:11 PM
Creation date
7/9/2026 4:52:07 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-136
Res Ord Title
R2026-136 Resolution Authorizing Lake Decatur Watershed Farmland Conservation Program Agreement With Lynn Clarkson for a Bioreactor Drainage Water Treatment Structure
Department
Public Works
Approved Date
7/6/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> USDA Unite titres Natural Resources Conservation Service <br /> Department of <br /> Agriculture <br /> Operation&Maintenance Plan <br /> Denitrifying Bioreactor(Code 605) <br /> Expected Lifespan <br /> The minimum expected lifespan of this practice is at least 10 year(s). <br /> Follow the operation and maintenance plan below to keep your denitrifying bioreactor functioning <br /> as intended and to accomplish the water quality objectives: <br /> • For bioreactors that are designed to be kept at the same setting year round,the settings are: <br /> Upstream(diversion)structure: 41 inches below the top of the structure(55 inches above structure <br /> bottom.) This can be accomplished with 7-inch(x5),5-inch(x4) boards. <br /> Downstream(capacity)structure: 75 inches below the top of the structure(21 inches above structure <br /> bottom.) This can be accomplished with 7-inch(x3) boards. <br /> • For bioreactors that are designed for seasonal operation,manage water control levels according to <br /> the following plan. Use the recordkeeping table on the last page of this O&M plan to keep track of <br /> the operation. <br /> Stoplog setting <br /> Mode Begin Date Upstream(diversion) Downstream(capacity) <br /> structure structure <br /> Fallow Inches below the Inches below the <br /> (After fail harvest activities) top of the structure top of the structure <br /> Open (or 2 weeks before spring Fully open Fully open <br /> planting) <br /> Crop (or 2 weeks after the end of inches below the inches below the <br /> spring planting activities) top of the structure' top of the structure' <br /> Open (Two weeks before fall Fully open Fully open <br /> harvest) <br /> During extremely wet periods in the growing season,lower the stoplogs to the Open mode to prevent <br /> the water table from rising into the crop root zone. <br /> • When water is released from a water control structure,high velocity flow has the potential of <br /> damaging the tile line. To prevent damage,lower the water level in the structure gradually. This is <br /> most easily achieved by pulling all the boards up no more than 2 inches,resulting in a 2 inch gap at <br /> the bottom of the structure. <br /> • Inspect after significant storm events and at least twice a year to identify repair and maintenance <br /> needs. Monitor surrounding areas for signs of vegetation stress due to prolonged wetness. <br /> Contact NRCS if an adjustment in board settings may be necessary. <br /> • Check the valves for proper functioning.Lock structures when not in use to prevent tampering <br /> and/or vandalism.Promptly repair or replace damaged or inoperable components. <br /> • Remove debris that may accumulate on,around or immediately upstream or downstream from the <br /> installed structure. <br /> • Remove debris from any surface inlets to the drainage system,to prevent excessive clogging of <br /> the bioreactor flow path. Keep any surface inlets that are connected to the supply tile in good <br /> repair to minimize trash entry into the system. <br /> • Repair any settlement or erosion that occurs along buried pipes. If this problem persists,evaluate <br /> the pipe for leakage and erosion of the fill material into or along the pipe. <br /> • Eradicate or otherwise remove all rodents or burrowing animals.Immediately repair any damage <br /> caused by their activity. <br /> • Protect the bioreactor from damage by farm equipment and livestock. <br /> NRCS,IL O&M-Page 1 of 3 April 2021 <br /> (Xora <br /> Af1ICSON CEMETERY 200-BIO 12 r � <br /> aowrs�uer oVM/2Gae <br /> 9 I Jwmy.h•w 1�rrrin•� Jzrhmiy;v 01100110 WI <br /> • nwrnpcnusrnaunn OPERATION AND IMA1 (605) iwracv <br />
The URL can be used to link to this page
Your browser does not support the video tag.