Laserfiche WebLink
Design and Implementation Activity 164 <br /> Improved Management of Drainage Water Design <br /> Client Name: Lynn Clarkson Plan Identifier: Clarkson Cemetery 200—Bio 12 <br /> Client Phone Number: (217) 853-6410 <br /> Farm Address: PO Box 80 Design Alternatives: Final Design <br /> Cerro Gordo,IL 61818 (Y/N) <br /> Manual Denitrifying Y <br /> Township, Range, Section T17N R4E SN l 3 Bioreactor <br /> Field GPS Coordinates: 39.9288, -88.6995 Automated Denitrifying N <br /> Field County, State: Piatt Co, IL Bioreactor <br /> TSP Name: Ben Reinhart TSP Business Address: <br /> TSP Phone Number: 765-650-8254 PO Box 446 <br /> TSP Email: ben@ecoexch.com Adair, IA 50002 <br /> TSP Number: TSP-22-24213 <br /> TSP Expiration Date: 09/17/28 .: (1 <br /> County of Service: Piatt Co, IL Ectis)stem t�rvices sChange <br /> Valuing Conservation <br /> To the best of my professional knowledge,judgement,and belief,these plans meet applicable NRCS standards.TSP services provided <br /> comply with all applicable Fderal,State,Tribal,and local laws and requirements.Designs meet applicable NRCS standards, <br /> specifications,and program requirements.Designs are consistent with the conservation program goals and objectives for which the <br /> program contract was entered into by the client.Designs incorporate alternatives that are both cost effective and appropriate to address <br /> the resource issues.The client agrees that plans and specifications adequately represent existing conditions and the selected preliminary <br /> design alternatives.The client understands and will abide with the operation and maintenace plans. Ecosystem Services Exchange,LLC <br /> (ESE)is not responsible for any issues related to the installation of the system detailed in this drainage plan. This includes,but is not <br /> limited to property damage,personal injury,or reduced functionality of the drainage system due to improper installation methods. <br /> Slight modifications to the planned system may be needed at the time of installation due to current field conditions and preferences of <br /> the contractor. The contractor should contact an ESE representative prior to making any adjustments to ensure that the proposed <br /> modifications will follow the management objectives of the system. Ultimately the contractor is responsible for the drainage system.In <br /> this plan ESE has outlined some basic management guidelines. Although these guidelines are based on the best available information, <br /> slight adjustments may be needed to achieve the optimum crop production and water quality results for this specific system. ESE is not <br /> responsible for any crop or property damage resulting from the mismanagement of this system. <br /> 01/19/2026 <br /> TSP Certification--Signature/Date: C:rs <br /> Client Receipt and Approval—Signature/Datc: .,.._ l jai.� ,�� t,'';i' ' ++1•- f <br /> NRCS Review and Approval —Signature/Date: <br />