Laserfiche WebLink
FRONTLINE <br /> COMMUNICATIONS Decatur Police Department <br /> A OMdun el Mora WetlbcMiM I An OsIskant Crisis Negotiation Vehicle Proposal <br /> DISPLAYS <br /> There will be 2 Displays provided, for the center workstations. <br /> The brand will be Samsung . <br /> They will be hardwired only. <br /> DISPLAYS <br /> There will be I Displays provided, for the rear workstation on the back wall. <br /> The brand will be Samsung . <br /> They shall be hardwired only. <br /> LIGHTING, INTERIOR BODY <br /> The 12V ceiling and under cabinet lights will be recess mounted, white/red, and dimmable. <br /> There will be DC LED dimmable lights installed in the ceiling to provide lighting for operations <br /> area.This entire bank of lights may be dimmed by a dimmer control switch located at power panel. <br /> There will be DC LED dimmable lights installed under the driver's side upper cabinets to provide <br /> lighting for operations area workstations. This entire bank of light may be dimmed by a centrally <br /> located dimmer control switch. <br /> There will be two(2)DC LED lights installed in the rear"service"area.These lights activate when <br /> the rear door is opened. <br /> WALL FINISH/SUBSTRATE <br /> The wall will be covered with 3/8" plywood and screwed to the aluminum wall structure. <br /> The walls will be finished with Light Gray,Command colored commercial grade non-static sound <br /> absorbing carpet on the lower portion and dry erase on the upper portion. <br /> FLOOR FINISH/SUBSTRATE <br /> The floor will be covered with 3/4" plywood and screwed to the aluminum floor tubes. <br /> The floor will be finished with Black FlecksLonseal heavy-duty vinyl flooring. An 8-foot-wide <br /> material will be used to eliminate seams in the finished floor. <br /> CEILING FINISH/SUBSTRATE <br /> 3/8" plywood will be applied to the bottom of the roof structure. <br /> Bid#253 Page 12 Printed: 5/11/2026 <br />