Laserfiche WebLink
CONSTRUCTION CHECK <br /> TBMd Elev. B.S. N.I. Note: Include pipe spillway inlet and outlet elev. <br /> Rod Const. Planned <br /> Station Reading Elev. Elev. Deviation Cross section and remarks <br /> Dimension of Principal Spillway Pipe Material <br /> Pond area sq.ft. @ ft. depth (If for fish production) <br /> Fill and Spillway (have) (have not) been seeded and mulched. <br /> Pond (has) (has not) been fenced. Kind <br /> Stockwater system adequate (yes) (no) <br /> Remarks: <br /> I certify that this job meets all the requirements of Illinois Standards and Specifications for: <br /> ElPond Ei]Grade Stabilization Structure <br /> by date <br />