My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-185 Resolution Authorizing the Execution of Agreement with the Norfolk Southern Railway Company for the Broadway Sewer Rehabilitation on Martin Luther King Jr. Drive, City Project 2022-01
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-185 Resolution Authorizing the Execution of Agreement with the Norfolk Southern Railway Company for the Broadway Sewer Rehabilitation on Martin Luther King Jr. Drive, City Project 2022-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2026 2:49:07 PM
Creation date
10/26/2026 2:49:05 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-185
Res Ord Title
R2026-185 Resolution Authorizing the Execution of Agreement with the Norfolk Southern Railway Company for the Broadway Sewer Rehabilitation on Martin Luther King Jr. Drive, City Project 2022-01
Department
City Manager
Approved Date
9/21/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 2026 Bypass Plan at N MLK Crossing Revision 0 <br /> Purpose <br /> This document presents the bypass pumping plan required to support Cured-in-Place Pipe(CIPP) <br /> rehabilitation of the existing sanitary sewer near the Norfolk Southern(NS)railroad crossing south of E <br /> Wabash Avenue and N Martin Luther King Jr. Drive in Decatur, Illinois.The purpose of this plan is to <br /> demonstrate that bypass operations will: <br /> • Maintain uninterrupted sewer service during CIPP installation <br /> • Avoid all encroachment,loading, excavation,or equipment placement within Norfolk Southern's <br /> right-of-way(ROW). <br /> • Comply with NS engineering, safety, and property protection requirements. <br /> Existing Sewer Conditions and Railroad Crossing <br /> The existing 72x48-inch sanitary sewer crosses beneath the tracks along N MLK Dr. Flow monitoring <br /> equipment installed south of the crossing recorded an average flow of 1.136 MGD.Taking into account a 1.2 <br /> factor of safety,a bypass design flow of 1.36 MGD was determined. <br /> The sewer crossing is located below the tracks and does not require excavation or disturbance within the NS <br /> zone of influence.All bypass activities occur outside NS property limits. <br /> Proposed Bypass Plan <br /> The proposed bypass piping diverts flow from MH 20-64, routes it east one block(above grade),and the <br /> proposed piping is routed through an existing 90-inch storm sewer that continues south(below grade), <br /> beneath the railroad at N Morgan Street. From the Morgan Street crossing,the bypass line continues west <br /> (above grade)along E Cerro Gordo Street and discharges into MH 37-15,where gravity flow resumes south <br /> along N Martin Luther King Jr. Drive.The City has authorized use of the storm sewer system for the purposes <br /> of this bypass plan. <br /> • No bypass piping crosses NS tracks <br /> • All pumps, hoses,or equipment pertaining to this work will utilize existing storm sewer <br /> infrastructure to cross beneath the NS ROW. <br /> • No excavation occurs within the influence zone <br /> • All routing remains within public ROW or City-controlled property <br /> 1 Norfolk Southern <br />
The URL can be used to link to this page
Your browser does not support the video tag.