My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-206 Resolution Approving Acceptance of FEMA Assistance to Firefighters Grant Funds for Diesel Exhaust Systems
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-206 Resolution Approving Acceptance of FEMA Assistance to Firefighters Grant Funds for Diesel Exhaust Systems
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2026 3:03:13 PM
Creation date
10/26/2026 3:03:10 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-206
Res Ord Title
R2026-206 Resolution Approving Acceptance of FEMA Assistance to Firefighters Grant Funds for Diesel Exhaust Systems
Department
Fire
Approved Date
10/19/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 31 Required Use of American Iron, Steel, Manufactured Products, and <br /> Construction Materials <br /> (1) Recipients of a federal award from a financial assistance program that <br /> provides funding for infrastructure are hereby notified that none of the funds <br /> provided under this federal award may be used for a project for infrastructure <br /> unless: (a) all iron and steel used in the project are produced in the United <br /> States—this means all manufacturing processes,from the initial melting stage <br /> through the application of coatings, occurred in the United States; (b) all <br /> manufactured products used in the project are produced in the United States— <br /> this means the manufactured product was manufactured in the United States; <br /> and the cost of the components of the manufactured product that are mined, <br /> produced, or manufactured in the United States is greater than 55 percent of <br /> the total cost of all components of the manufactured product, unless another <br /> standard for determining the minimum amount of domestic content of the <br /> manufactured product has been established under applicable law or <br /> regulation;and (c) all construction materials are manufactured in the United <br /> States—this means that all manufacturing processes for the construction <br /> material occurred in the United States. (2)The Buy America preference only <br /> applies to articles, materials, and supplies that are consumed in, incorporated <br /> into, or affixed to an infrastructure project.As such, it does not apply to tools, <br /> equipment, and supplies, such as temporary scaffolding, brought to the <br /> construction site and removed at or before the completion of the infrastructure <br /> project. Nor does a Buy America preference apply to equipment and <br /> furnishings, such as movable chairs, desks, and portable computer equipment, <br /> that are used at or within the finished infrastructure project but are not an <br /> integral part of the structure or permanently affixed to the infrastructure project. <br /> (3)Waivers.When necessary, recipients may apply for, and the agency may <br /> grant, a waiver from these requirements.The agency should notify the <br /> recipient for information on the process for requesting a waiver from these <br /> requirements.a.When the Federal agency has determined that one of the <br /> following exceptions applies, the federal awarding official may waive the <br /> application of the domestic content procurement preference in any case in <br /> which the agency determines that: i.applying the domestic content <br /> procurement preference would be inconsistent with the public interest; ii.the <br /> types of iron, steel, manufactured products, or construction materials are not <br /> produced in the United States in sufficient and reasonably available quantities <br /> or of a satisfactory quality;or iii.the inclusion of iron, steel, manufactured <br /> products, or construction materials produced in the United States will increase <br /> the cost of the overall project by more than 25%.b.A request to waive the <br /> application of the domestic content procurement preference must be in writing. <br /> The agency will provide instructions on the format, contents,and supporting <br /> materials required for any waiver request.Waiver requests are subject to <br /> public comment periods of no less than 15 days and must be reviewed by the <br /> Made in America Office.c.There may be instances where a federal award <br /> qualifies, in whole or in part, for an existing waiver described at"Buy America" <br /> Preference in FEMA Financial Assistance Programs for Infrastructure <br /> FEMA.gov. (4) Definitions.The definitions applicable to this term are set forth <br /> at 2 C.F.R. § 184.3, the full text of which is incorporated by reference. <br />
The URL can be used to link to this page
Your browser does not support the video tag.