Laserfiche WebLink
Council Memo <br /> Public Works Department <br /> No. 2026-81 <br /> DATE: 10/19/2026 <br /> TO: Honorable Mayor Julie Moore Wolfe and City Council Members <br /> FROM: Melissa Hon, City Manager <br /> Matt Newell, Director of Public Works <br /> Robert Weil, Water Production Manager <br /> SUBJECT: Resolution Authorizing a Sponsored Service Agreement with the Board of Trustees of the <br /> University of Illinois to Assess Sustainable Yield of the Mahomet Aquifer at the Decatur Wellfields <br /> SUMMARY RECOMMENDATION: It is recommended that the City Council authorize the Mayor to sign, <br /> and the City Clerk to attest, a Resolution authorizing a Sponsored Service Agreement with the Board of <br /> Trustees of the University of Illinois to Assess Sustainable Yield of the Mahomet Aquifer at the Decatur well <br /> fields in the amount of$72,948.00. <br /> BACKGROUND: After the 1988 drought, the City of Decatur made a strategic decision to install wells into the <br /> Mahomet Aquifer in DeWitt County as an emergency water supply. Since that time,the well field has become <br /> the most important alternate water supply in the City's drought action plan. <br /> During the 2025/26 drought,the City pumped about 456 million gallons (MG) from the DeWitt well field, of <br /> which an estimated 70%, or 320 MG, reached Lake Decatur via Friends Creek and the Sangamon River. It is <br /> believed that the lake would have been about 4 inches lower during the drought without the use of emergency <br /> supplies from the DeWitt well field. <br /> Despite its importance, the maximum sustainable yield from DeWitt well field is not well documented. The <br /> current Alternate Water Supply Plan assumes a net yield of 630 MG based on historical evidence on impact to <br /> surrounding wells,but some research by the Illinois State Water Survey(ISWS) indicates that the yield could be <br /> higher. The drawdown of the aquifer was last studied in a 2001 report which stated, without supporting <br /> evidence,that the well field should be able to support a sustained withdrawal of 7.5 milliongallonsper day <br /> (MGD). <br /> INTERA is currently reviewing options for additional water supplies to provide drought resilience and has <br /> recommended that the 2001 yield estimate be reviewed for accuracy and also review its effect on the new Lane <br /> property and the Cisco well field. The ISWS has strong, well established,Mahomet Aquifer expertise and was <br /> requested to propose a modeling study. <br /> The proposed study will include withdrawals from the DeWitt well field,the newly acquired field near Lane, <br /> and the City's Cisco well field. This will detail the interaction between them and settle on an expected sustained <br /> withdrawal rate. <br /> The City of Decatur has enjoyed a long and cooperative relationship with ISWS, and we have worked together <br /> to gain knowledge of the Mahomet aquifer. The City has installed monitoring wells to measure aquifer <br /> drawdown as the wells are operated. ISWS has used a number of advanced technologies to study the aquifer, <br /> including helicopter-based time domain electronics used to develop 3D digital maps of groundwater basins. <br />