My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-200 Resolution Authorizing a Sponsored Service Agreement with the Board of Trustees of the University of Illinois to Assess Sustainable Yield of the Mahomet Aquifer at the Decatur Wellfields
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-200 Resolution Authorizing a Sponsored Service Agreement with the Board of Trustees of the University of Illinois to Assess Sustainable Yield of the Mahomet Aquifer at the Decatur Wellfields
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2026 1:52:28 PM
Creation date
10/27/2026 1:52:27 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-200
Res Ord Title
R2026-200 Resolution Authorizing a Sponsored Service Agreement with the Board of Trustees of the University of Illinois to Assess Sustainable Yield of the Mahomet Aquifer at the Decatur Wellfields
Department
Public Works
Approved Date
10/19/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Statement of Work and Deliverable(s) <br /> = ILLINOIS Prairie Research Institute <br /> Illinois State Water Survey <br /> 2204 Griffith Drive,MC-674 <br /> Champaign,IL 61820 <br /> Assessing Sustainable Yield of the Mahomet Aquifer at the Decatur WeWields <br /> A Proposal to the City of Decatur,IL, <br /> August 2026 <br /> Vlad lordache(PI,Assistant Hydrogeologist) <br /> Daniel Hadley(Co-PI,Associate Hydrogeologist) <br /> Illinois State Water Survey(ISWS)Champaign,Illinois <br /> Introduction <br /> The City of Decatur has historically relied on the DeWitt Countywellfield as an <br /> emergency water supply during drought conditions and periods of low surface water levels <br /> in Lake Decatur.Past activations of this eight-well system,notably during the summers of <br /> 2005,2007,2011,2012,2025,and 2026 resulted in 30 to 50 feet of drawdown in the <br /> Mahomet Aquifer.The City is proactively planning for economic development,which is <br /> projected to increase overall water demand,prompting the City to quantify the sustainable <br /> yield from the Mahomet Aquifer. <br /> To support the City's proactive water management and infrastructure planning,the <br /> ISWS will evaluate the sustainable yield of the current DeWittwellfield and potential <br /> expansion areas.This modeling effort will run concurrentlywith,and provide critical yield <br /> estimates for,INTERA's Alternative Water Supply Plan Update.By quantifying the <br /> operational cone of depression and determining acceptable drawdown limits under various <br /> economic development scenarios,this project will provide the City of Decatur with a data- <br /> driven framework necessary to safely expand and manage their Mahomet Aquifer <br /> resources. <br /> Scope of Work <br /> Task 1:Groundwater Flow Model Refinement <br /> • ISWS will leverage its existing MODFLOW groundwater flow model of the Illinois <br /> River Basin,which encompasses the Mahomet Aquifer in DeWitt County. <br /> • Utilizing FloPy and Python-based scripting,a high-resolution inset model will be <br /> developed to evaluate pumping scenarios at a refined local scale. <br /> UNIVERSITY OF ILLINOIS URBANA-CHAMPAIGN <br /> 217.333.2210•isws.illinois.edu <br /> Page 8 of 9 <br /> SPA Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.