My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-192 Resolution Authorizing the City of Decatur to Engage Deutsche Bahn Engineering, Consulting, and Operations North America, Inc. (DB E.C.O. North America, Inc.) For Technical Services for Environmental Analysis and Mitigation Related to the
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-192 Resolution Authorizing the City of Decatur to Engage Deutsche Bahn Engineering, Consulting, and Operations North America, Inc. (DB E.C.O. North America, Inc.) For Technical Services for Environmental Analysis and Mitigation Related to the
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2026 4:29:01 PM
Creation date
11/4/2026 4:28:59 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-192
Res Ord Title
R2026-192 Resolution Authorizing the City of Decatur to Engage Deutsche Bahn Engineering, Consulting, and Operations North America, Inc. (DB E.C.O. North America, Inc.) For Technical Services for Environmental Analysis and Mitigation Related to the
Department
City Manager
Approved Date
10/5/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Review and assess the 2013 Decatur Area Transportation Efficiency Study(DATES)RTC rail simulation <br /> model: determine whether the RTC network model built for that study—which includes NS,CN,and CSX <br /> operating data and simulates the Decatur area network—can be updated with current operating data as the <br /> baseline for this analysis,or whether a new baseline model must be built;document the approach in the <br /> technical proposal <br /> • Establish updated at-grade crossing baseline data for priority NS crossings in the Brush College Road <br /> corridor—focusing on the ADM East Plant crossing and any remaining at-grade crossings—using current <br /> FRA crossing inventory records,field observation,and NS operating data from STB discovery.Note: a grade <br /> separation has been constructed at Brush College Road and Faries Parkway since the 2013 DATES study;the <br /> analysis should document current conditions at the remaining crossings and assess whether the merger <br /> operating plan affects the adequacy of the completed grade separation or changes operating conditions <br /> beyond those it was designed to accommodate <br /> • Assess whether the merger's projected changes in NS flat yard and switching activity affect the second,not- <br /> yet-constructed segment of the Brush College Road corridor plan—an overpass proposed a few blocks south <br /> of Faries Parkway over an NS-owned rail yard,intended to replace a functionally obsolete underpass—and <br /> note any implications for that project's design assumptions,justification,or timing(per the City's Brush <br /> College Road/Faries Parkway grade separation grant application) <br /> • Analyze the merger operating plan as filed and as supplemented by the July 27,2026 UP/NS filing: document <br /> the projected approximately 161-car-per-day flat yard volume reduction,its operational basis,and its <br /> implications for yard staffing and local service <br /> • Evaluate locomotive shop scenarios:reconcile against the redesignated Employee Impact Exhibits <br /> (Appendices A and B to Applicants'Amended Application,filed July 27,2026),which report Decatur- <br /> specific position changes by craft and management category across the three operating scenarios Applicants <br /> filed; identify functions at risk of relocation or consolidation,trigger conditions,and the timeline implied by <br /> the merger operating plan <br /> • Model projected changes in train volumes, lengths,and routing on the Decatur–Kansas City corridor(ex- <br /> Wabash,approximately 404 miles)under the merger plan,with reference to at least one alternative routing or <br /> operating scenario from the STB application <br /> • Model crossing gate-down frequency and duration at priority Decatur crossings under projected merger traffic <br /> conditions,compared to current baseline—focus on crossings affecting emergency response corridors and <br /> major arterials <br /> • Identify switching,dispatching,or interlocking changes affecting local industry rail access and assess <br /> implications for shipper service reliability <br /> Note: The Decatur Area Transportation Efficiency Study(DUATS, December 2013)is available as <br /> background context on the local transportation network and may assist proposers in <br /> understanding crossing geography and freight patterns. It does not constitute current baseline <br /> data for STB purposes and should not be relied upon as a primary source. Proposers should <br /> identify what current data—including STB filed waybill data, FRA crossing inventory records, <br /> and NS operating timetables — they propose to use to establish the current baseline. <br /> Workstream 2 — Economic and Employment Impact Analysis <br /> Objective: Quantify the direct economic and employment consequences of the merger for city of <br /> Decatur, focused on the harms most directly traceable to the merger operating plan and suitable for <br /> inclusion in STB comments. <br /> • Quantify current NS railroad employment in Decatur by facility(flat yard,locomotive shop,other functions) <br /> and craft category;estimate total compensation and direct supplier spending in the local economy as an <br /> economic baseline <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.