My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-192 Resolution Authorizing the City of Decatur to Engage Deutsche Bahn Engineering, Consulting, and Operations North America, Inc. (DB E.C.O. North America, Inc.) For Technical Services for Environmental Analysis and Mitigation Related to the
COD
>
City Clerk
>
RESOLUTIONS
>
2026
>
R2026-192 Resolution Authorizing the City of Decatur to Engage Deutsche Bahn Engineering, Consulting, and Operations North America, Inc. (DB E.C.O. North America, Inc.) For Technical Services for Environmental Analysis and Mitigation Related to the
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2026 4:29:01 PM
Creation date
11/4/2026 4:28:59 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2026-192
Res Ord Title
R2026-192 Resolution Authorizing the City of Decatur to Engage Deutsche Bahn Engineering, Consulting, and Operations North America, Inc. (DB E.C.O. North America, Inc.) For Technical Services for Environmental Analysis and Mitigation Related to the
Department
City Manager
Approved Date
10/5/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provisions with estimated values and proposed STB condition language where appropriate—ranked by <br /> magnitude of documented harm <br /> • Prepare technical exhibits for the City's STB merits comment filing: data tables, maps, modeling outputs,and <br /> supporting analysis from Workstreams 1-3 formatted for the STB record and consistent with STB evidentiary <br /> standards <br /> • Prepare a data request memorandum—in coordination with the City's STB legal counsel identifying the <br /> specific railroad operating data, workpapers, and documents the City should seek through the STB discovery <br /> process to strengthen or verify the analysis <br /> • Prepare a decision-maker summary(maximum 8 pages)for City Council: findings, mitigation gap,and <br /> recommended asks—written for a non-technical audience <br /> • Provide technical support for one STB public hearing appearance if scheduled, including preparation of <br /> testimony exhibits and attendance at a pre-hearing preparation session with STB legal counsel <br /> Note:All deliverables intended for STB submission must be reviewed by the City's STB legal <br /> counsel before filing. Coordination with counsel is a required part of this workstream, not an <br /> optional step. <br /> 3. DELIVERABLES AND SCHEDULE <br /> All deliverables are the property of the City of Decatur. The schedule is driven by the STB merits <br /> comment deadline, which will be set by the Board following its review of the July 27, 2026 UP/NS <br /> supplemental filing.The prime firm must demonstrate the capacity to deliver on a compressed schedule <br /> if required. <br /> Deliverable Description Target Date <br /> Project Kickoff Memo Work plan, schedule, data requests, Within 10 days of NTP <br /> and subconsultant assignments <br /> confirmed <br /> Discovery Data Coordinated with STB counsel — Within 15 days of NTP <br /> Request Memo specific data categories and <br /> document requests to be served on <br /> UP/NS through discovery <br /> Baseline Data Report Current NS operations baseline: Within 25 days of NTP <br /> train counts, flat yard volumes, <br /> crossing gate-down data, <br /> locomotive shop employment — <br /> sources documented <br /> Interim Briefing—WS Preliminary rail operations and ^'6 weeks post-NTP <br /> 1 &2 economic impact findings presented <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.