My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-84 CONTRACT WITH ENTLER EXCAVATING
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-84 CONTRACT WITH ENTLER EXCAVATING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:18 AM
Creation date
7/21/2015 9:55:55 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-84
Res Ord Title
CONTRACT WITH ENTLER EXCAVATING FOR 2015 MISCELLANEOUS SANITARY & STORM SEWER IMPROVEMENT
Department
Public Works
Approved Date
7/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br /> GC-16 PERMITS <br /> 1 It is the Contractor's responsibility to obtain all necessary permits. Any costs incurred in <br /> obtaining these permits are to be incidental to the related contract item. Permit fees will be <br /> ' waived for those permits issued by the City of Decatur. <br /> GC-17 DOCUMENTATION OF EXISTING CONDITIONS <br /> ' The Contractor shall provide DVD or Digital video of existing facilities along the route <br /> or area of all construction, prior to the start of such construction. Construction of this facility <br /> will generally be along street right-of-way containing trees,bushes, fences, driveways and <br /> similar items. Special attention shall be given to coverage of the entire easement and immediate <br /> adjacent areas which might be disturbed during construction. <br /> ' The video shall be adequate to serve as a basis for comparison in determining whether the <br /> terms of the specifications with respect to replacements, restoration and/or preservation of <br /> existing surfaces have been complied with. One print of the video taken shall be given to the <br /> ' Engineer for his files. The cost for this item shall be included in the respective prices for the <br /> various items of work. <br /> GC-18 PREVAILING WAGE RATES <br /> The Contractor shall supply the Engineer with weekly certified copies of the payroll for <br /> both the prime Contractor and their subcontractors. The Engineer will monitor the payroll for <br /> compliance with the applicable "prevailing wage rates" as required by the Special Conditions of <br /> this contract. <br /> ' GC-19 PROJECT MAINTENANCE <br /> ' Should the City become aware of an unsafe condition existing within the scope of this <br /> project,the City will attempt to contact the Contractor to resolve the unsafe condition. However, <br /> if the City is unable to contact the Contractor's designated representative or if the Contractor fails <br /> to respond within a reasonable period, the City will perform the necessary operations and the <br /> cost for labor, equipment and materials will be deducted from the contract. <br /> GC-20 ROYALTIES,PATENTS AND COPYRIGHTS <br /> The Contractor shall pay all royalties and license fees. The Contractor shall defend suits <br /> or claims for infringement of copyrights and patent rights and shall hold the Owner and Engineer <br /> harmless from loss on account thereof but shall not be responsible for such defense or loss when <br /> a particular design, process or product of a particular manufacturer or manufacturers is required <br /> by the Contract Documents or where the copyright violations are contained in Drawings, <br /> Specifications or other documents prepared by the Owner or Architect. However, if the <br /> Contractor has reason to believe that the required design, process or product is an infringement <br /> of a copyright or a patent, the Contractor shall be responsible for such loss unless such <br /> information is promptly furnished to the Architect. <br /> 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.