My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-84 CONTRACT WITH ENTLER EXCAVATING
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-84 CONTRACT WITH ENTLER EXCAVATING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:18 AM
Creation date
7/21/2015 9:55:55 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-84
Res Ord Title
CONTRACT WITH ENTLER EXCAVATING FOR 2015 MISCELLANEOUS SANITARY & STORM SEWER IMPROVEMENT
Department
Public Works
Approved Date
7/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br /> THIS CONTRACT, made and entered into this 6th day of July, 2015, by and between the <br /> City of Decatur, Illinois, hereinafter called "Owner", and Entler Excavating Company, Inc., <br /> hereinafter called the "Contractor". <br /> WITNESSETH: <br /> That for and in consideration of the payments, covenants, and agreements stated herein, the <br /> Contractor and Owner agree as follows: <br /> 1. The Contractor shall perform and complete in a Good and Workmanlike Manner all <br /> Work required in connection with "2015 MISCELLANEOUS SANITARY & <br /> STORM SANITARY SEWER IMPROVEMENT PROJECT, CITY PROJECT <br /> 2015-09", all in strict accordance with the Contract Documents, including any and all <br /> Addenda prepared by the City Engineer, with specifications and drawings are made a <br /> part of this Contract; and in strict compliance with the Contractor's Bid Proposal and <br /> the other Contract Documents herein mentioned, which are a part of the Contract; and <br /> the Contractor shall do everything required by this Contract and the other documents <br /> constituting a part thereof. <br /> 2. Payments are to be made to the Contractor by the Owner in accordance with and <br /> subject to the provisions embodied in the documents made a part of this Contract, or <br /> as prescribed by law. <br /> 3. Work under this Contract shall commence on the date specified in the written Notice <br /> to Proceed from the Owner to the Contractor. Upon receipt of said Notice, the <br /> Contractor shall diligently and continuously prosecute and substantially complete all <br /> Work under this Contract. <br /> 4. A Completion Date is in effect for this project in accordance with Section 108 of <br /> the Illinois Department of Transportation, Standard Specifications for Road and <br /> Bridge Construction. The Completion Date for this project is June 1,2016. <br /> 5. This Contract consists of the following component parts, herein defined as the <br /> Contract Documents, all of which are as full a part of this Contract as if herein set out <br /> verbatim, or if not attached, as if hereto attached: <br /> Advertisement for Bids General Conditions <br /> Information for Bidders Special Conditions <br /> Bid Proposal Standard Specifications <br /> Addenda Number&Date Project Drawings <br /> Non-Collusion Affidavit Special Provisions <br /> Contract(This Instrument) Supplemental Specifications <br /> Contract Change Orders Appendix(s) <br /> Performance Bond <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.