My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-55 LOCAL AGENCY AGREEMENT - ILLINOIS JOBS NOW
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-55 LOCAL AGENCY AGREEMENT - ILLINOIS JOBS NOW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2018 2:34:55 PM
Creation date
7/21/2015 2:32:01 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-55
Res Ord Title
LOCAL AGENCY AGREEMENT FOR STATE PARTICIPATION - ILLINOIS JOBS NOW
Approved Date
5/18/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� , <br /> , , , <br /> � . <br /> ti <br /> Local Agency �l �`��Department �ob Number-Construction <br /> City of Decatur `� ����� <br /> Section Local Agency JobNumber-Engineering/ROW <br /> 15-00933-00-BR Agreement for State Participation D-97-032-15 I <br /> This Agreement is made and entered into between the above local agency hereinafter referred to as"LA", and the State of Illinois,acting ' <br /> by and through its Department of Transportation, hereinafter referred to as"STATE". The STATE and LA jointly propose to improve the <br /> designated location as shown below. <br /> Location <br /> Local Name Brush College Rd Route FAU 7448 Length 0.7 miles <br /> Termini over Norfolk Southern Railroad <br /> Current Jurisdiction City of Decatur <br /> Project Description <br /> Professional services to provide Phase II design for a bridge crossing the NSRR track yard south of Faries Parkway. Work will include <br /> topographic surveying, roadway design,drainage design, utility coordination,structure design, preliminary site investigations,stakeholder <br /> coordination, preparation of right of way documents,and other items of project design. <br /> Division of Cost <br /> Type of Work STATE(1) LA(2) Total <br /> Participating Construction 0 <br /> Non-Participating Construction 0 <br /> Preliminary Engineering 2,006,014 150,585 2,156,599 <br /> Construction Engineering 0 <br /> Right-of-W ay 0 <br /> 0 <br /> 0 <br /> TOTAL $2,006,014 $ 0 $150,585 $2,156,599 <br /> Note: (1)100%Illinois Jobs Nowfunds NTE 2,006,014 <br /> (2)Balance shall be the responsibility of the local agency <br /> Payment Method(check one): <br /> ❑ Upon execution of the construction contract and request of payment from the LA,the STATE will pay the LA 95%of its share of the <br /> project costs. The remaining 5%wilt be paid to the LA upon receipt of the final invoice. <br /> ❑ The STATE will reimburse the LA for the STATE share of the project on the basis of periodic billings, provided said billings contain <br /> sufficient cost information and show evidence of payment by the LA <br /> Printed 5/12/2015 Page 1 of 3 BLR 05323(Rev.07/11/14) <br />
The URL can be used to link to this page
Your browser does not support the video tag.