My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-54 AGREEMENT WITH AECOM TECHNICAL SERVICES INC
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-54 AGREEMENT WITH AECOM TECHNICAL SERVICES INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2015 2:36:58 PM
Creation date
7/21/2015 2:36:55 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-54
Res Ord Title
AGREEMENT WITH AECOM TECHNICAL SERVICES INC - ENGINEERING SERVICES
Department
Public Works
Approved Date
5/18/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Consulting Engineer expressly acknowledges,recognizes and agrees that the only authority to <br /> approve change orders to this Agreement or the Scope or Services or the cost(s)therein is with the <br /> City Council of the City. <br /> SECTION II. BASIC SERVICES <br /> A. FINAL DESIGN PHASE. <br /> The Consulting Engineer shall,after written authorization to proceed with the Final Design Phase: <br /> 1. Drawings and Specifications. Utilizing and using the preliminary design documents and <br /> preliminary design opinion of probable Project costs as approved by the City's Representative, <br /> prepare for incorporation in the Contract Documents final drawings to show the character and <br /> extent of the Project("Drawings")and specifications (Specifications"). The Specification shall <br /> consist of Part 3 "Technical Specifications"of the City's standard Capital Improvement <br /> Construction Contract(CICO). Specific requirements of the aforementioned Drawings and <br /> Specifications are included in Exhibit A, Scope of Services. <br /> 2. Approvals of Governmental Entities. Furnish to the City's Representative such documents and <br /> design data as may be required for,and assist in the preparation of,the required documents so <br /> that the City may apply for approvals of such governmental authorities as have jurisdiction over <br /> design criteria applicable to the Project, and assist in obtaining such approvals by participating in <br /> submissions to and negotiations with appropriate authorities. <br /> 3. Adjusted Project Costs. Advise the City's Representative of any adjustments to the latest opinion <br /> of probable Project Costs caused by changes in extent or design requirements of the Project or <br /> construction costs and furnish a revised opinion of probable Project Cost based on the Drawings <br /> and Specifications.Project Costs include construction cost,contingencies,allowances for charges <br /> of all professionals and consultants,allowances for the cost of land and rights-of-way, allowances <br /> for the relocation of utility facilities and equipment if necessary,and allowances for <br /> compensation for damages to properties and interest and financing charges. <br /> 4. Contract Document Preparation. Complete preparation of the construction contract documents by <br /> filling in the necessary information in Parts 1,II,and IV of the City's standard CICC. The <br /> Consulting Engineer shall prepare Part 3 "Technical Specification"of the CICC for inclusion in <br /> the standard construction contract. The Consulting Engineer shall not alter the City's standard <br /> contract document without the permission of the City's Representative. The City's <br /> Representative may provide the Consulting Engineer with previously prepared Technical <br /> Specifications which may be used as appropriate. The Consulting Engineer shall,to the <br /> maximum extent possible, follow the formats for Technical Specifications as provided by the <br /> City's Representative. <br /> 5. Document Presentation. Furnish paper copies and digital copies of the CICC in the number and <br /> format specified in Exhibit A, Scope of Work and present and review the CICC in person with the <br /> City as the City's Representative shall direct. The cost of document reproduction shall be <br /> considered to be a reimbursable expense and paid in accordance with Section V(C) of this <br /> Agreement. <br /> 6. Completion Time. The Final Drawings and Specifications shall be completed,submitted and <br /> approved by the City's Representative within the time period set forth in Exhibit C, Project <br /> Timeline. <br /> Last Revised:04/29/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.