Laserfiche WebLink
• SA 1829 - EXHIBIT B <br /> f ' <br /> How tomorrow moves Order of Magnitude Estimate <br /> Amanda DeCesare Project Information <br /> CSX Public Projects Outside ParILDOT <br /> 1717 Dixie Highway,Ste.400 Street Name: iOcean Trail Rd. <br /> Ci : jDecatur Railroad M.P.: BD-272.82 <br /> Fort Wright, KY 41011-2785 State: Illinois DOT#: 1154634X <br /> Telephone(869)426-6924 Count : !Macon T e: [Signal Installation <br /> PROJECT DESCRIPTION: Ocean Trail Rd.-Install crossing warning devices (FLS&G) and CWT detection <br /> equipment. <br /> Engineering Costs: <br /> IPreliminary Engineering $ 9,403.00 <br /> [Contract En ineerin $ 16,410.00 <br /> [Construction Engineering $ 4,360001 <br /> Total Engineerin Costs: i $ 30,173 00 <br /> I Material Costs: <br /> ,Shop Material $ 33,405.50 <br /> [Field Material $ 33,712.74 ; <br /> !Material Shipping (Freight) E $ 5,800.00 <br /> !Sales Tax I <br /> IAC Power ; $ 2,500.00 <br /> iAdditional Items _. $ <br /> ! Total Material Costs: 75,418 24 <br /> IEquipment Costs: <br /> ICompany Owned <br /> !Rental $ $ 480.00 <br /> Total Equipment Costs: $ 480.00 <br /> !Labor Costs: <br /> [Construction Labor $ 29,064.00 <br /> ;Shop Labor ( $ 1,260.00 <br /> Additives for Construction Labor $ 34,545.00 <br /> 'Additives for Shop Labor $ 1,498.00 <br /> Meals and Lodging (Substistence) I $ 12,740.00 <br /> Total Labor Costs: $ 79,107.00 } <br /> [Miscellaneous Costs: <br /> lVaccum Truck Rental $ 5,000.00 <br /> Prepared By: Scott Elliott _ 9/25/2014 Total Miscellaneous Costs: �� 5,000.00 <br /> Subtotal: $ 190,178.24 <br /> Signature: Contingency: $ 47,544.56 <br /> Total: $ 237,722.80 <br /> Disclaimer:This Order of Magnitude Estimate Shall not be use in the Negotiation of Preliminary Engineering,Construction,or Maintenance <br /> Agreements.This Estimate is not valid for ordering material or funding CSX Labor forces.Actual Costs may vary pending full design and <br /> detailed estimate. <br />