Laserfiche WebLink
Project Name: Streetscape Festival Power Wiring <br /> Engineer's Estimate Bodine Electric of Decatur Anderson Electric <br /> Project Number: 2014.27 1845 N.22nd Street 1921 Oak Ave. <br /> ARCHITECTURAL Decatur,IL 62521 Mattoon,IL 61938 <br /> EXPRESSIONS,LLP <br /> Bid Date: Friday,April 10,2015 113 ILLINI DRIVE David W.Rath)e,Pres. Earle W.Anderson,Pres. <br /> FORSYTH,IL 62535 <br /> Time: 10:00 A.M. Duane Turner Derek J.Bartlett <br /> Steve Reagan dturner(Wbodinemail.com Branch Mgr. <br /> Fund: 2010 Bond Project Fund DerekB(a)Anderson-Electdc.com <br /> PH: 217-877-4620 <br /> Organization Code: 43434305 FAX: 217-877-4625 <br /> Object Code: 469902 <br /> Item Pay item QTY Unit Unit Price Total Unit Price Total Total <br /> Number <br /> SP-14B ELECTRIC CABLE IN CONDUIT, 1C#2 COPPER 4,074 LFEET $3.00 $12,222.00 $1.64 $6,681.36 $1.92 $7,822.08 <br /> SP-14C ELECTRIC CABLE IN CONDUIT, 1C 2/0 COPPER 6,537 LFEET $5.25 $34,319.25 $2.63 $17,192.31 $3.31 $21,637.4 <br /> SP-14D ELECTRIC CABLE IN CONDUIT, 1C 3/0 COPPER 6,761 LFEET $6.35 $42,945.05 $3.05 $20,627.15 $4.15 $28,066.45 <br /> SP-14E ELECTRIC CABLE IN CONDUIT, 1C 350 KCM COPPER 1,568 LFEET $11.75 $18,424.00 $5.71 $8,953.28 $8.73 $13,688.6 <br /> SP-15 EXISTING ELECTRIC SERVICE DEMOLITION,SPECIAL 1 EACH $1,000.00 $1,000.00 $1,020.12 $1,020.12 $5,355.00 $5,355.00 <br /> SP-16 ALTERATIONS,CANCELLATIONS, EXTENSIONS, 1 LSUM $18,000.00 $18,000.00 $18,000.00 $18,000.00 $18,000.00 $18,000.00 <br /> DEDUCTIONS AND EXTRA WORK <br /> TOTAL BIDS(AS CORRECTED) $199,741.10 $101,239.7 $128,993.941 <br /> Percent Over Under ENGINEER'S ESTIMATE -49.31% -35.42% <br /> Matthew C. Newell, P.E., City Engineer Date <br /> PBge 9 of <br />