GENERAL CONDITIONS <br /> GC-13 LIQUIDATED DAMAGES <br /> Time is of the essence to the contract. Should the Contractor fail to complete the work <br /> within the working days stipulated in the contract or on or before the completion date stipulated <br /> in the contract or within such extended time as may have been allowed, the Contractor shall be <br /> liable and shall pay to the City the amount shown in the following schedule of deductions, not as ' <br /> a penalty but as liquidated damages, for each day of overrun in the contract time or such <br /> extended time as may have been allowed. The liquidated damages for failure to complete the <br /> contract on time are approximate, due to the impracticality of calculating and proving actual <br /> delay costs. This schedule of deductions establishes the cost of delay to account for <br /> administration, engineering, inspection, and supervision during periods of extended and delayed <br /> performance. The costs of delay represented by this schedule are understood to be a fair and <br /> reasonable estimate of the costs that will be borne by the City during extended and delayed <br /> performance by the Contractor of the work, remaining incidental work, correction of work <br /> improperly completed, or repair of work damaged as a result of the Contractor. The liquidated <br /> damage amount specified will accrue and be assessed until final completion of the total physical <br /> work of the contract even though the work may be substantially complete. The City will deduct <br /> these liquidated damages from any monies due or to become due to the Contractor from the City. <br /> Schedule of Deductions for Each Day of Overrun in Contract Time <br /> Original Contract Amount Daily Charges <br /> From More Than To and Including Calendar Day Work Day <br /> $ 0 $ 100,000 $ 475 $ 675 <br /> 100,000 500,000 750 1,050 <br /> 500,000 1,000,000 1,025 1,425 <br /> 1,000,000 3,000,000 1,275 1,725 <br /> 3,000,000 6,000,000 1,425 2,000 <br /> 6,000,000 12,000,000 2,300 3,450 <br /> 12,000,000 And over 5,800 8,125 <br /> When a completion date is specified, the daily charge will be made for every day shown on the <br /> calendar beyond the specified completion date. When the time limit is specified as working days, <br /> the daily charge will be made for each additional working day, computed as specified in Article <br /> 108.04 of the Standard Specifications for Road and Bridge Construction, dated January 1, 2012, <br /> published by the Illinois Department of Transportation. If contracts are awarded on the basis of <br /> a multiple bid, the contract amounts of the individual contracts comprising the multiple bid will <br /> be totaled and the daily charge shall be that required for such total amount. <br /> 33 <br />