My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-28 AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-28 AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:18 AM
Creation date
7/22/2015 1:16:00 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-28
Res Ord Title
AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC. TO DESIGN THE MCKINLEY / 7TH WARD SEWER REHABILITATION
Department
Public Works
Approved Date
3/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McKinley Avenue Sewer <br /> This sewer was originally called the North Side Interceptor and begins near the intersection of Jasper <br /> Street and Garfield Avenue and drains to the McKinley Avenue Combined Sewer Overflow facility <br /> owned by the Sanitary District of Decatur near the northwest corner of Monroe Street and McKinley <br /> Avenue. The sewer was originally constructed circa 1930 and varies in size from 27"to 72". <br /> A section of the sewer also extends south along Monroe Street to Harrison Avenue. See the attached <br /> location map. <br /> Initial inspections of the sewer indicated some flow line deterioration, water infiltration through joints <br /> with some separated joints, and cracks. Figure 3 below shows some images of the sewer condition. <br /> Gushing Infiltration <br /> w Mineral Deposita <br /> McKinley-60"pipe McKinley-42"pipe <br /> Figure 3 Inspection photos depicting the general condition of the McKinley Avenue Sewer. <br /> 7th Ward Sewer and 7th Ward Relief Sewer <br /> The 7th Ward Sewer was built around 1905 to serve growing industrial, commercial, and residential <br /> development. As the name suggests, it hearkens back to the time when the City was divided into wards. <br /> The sewer begins near Leafland and Edward Street and flows south and west, passing through Millikin <br /> University in what was originally a natural valley that has since been filled in to accommodate the <br /> university's expanding needs. The 7th Ward Sewer flows west from Millikin to a junction structure in <br /> Fairview Park, and then continues roughly south to the 7th Ward Combined Sewer Overflow facility <br /> owned by the Sanitary District of Decatur located near the far west end of Sunset Avenue. The original <br /> sewer was a combination of monolithic concrete and brick pipe varying from 36" to 56"diameter. <br /> The 7th Ward Relief Sewer begins at King and Pine Streets and flows south and west, generally <br /> following the alignment of the 7th Ward Sewer. The Relief Sewer was completed in 1942 and <br /> constructed of 60"to 84" diameter reinforced concrete pipe to both increase sewer capacity through the <br /> Millikin University area and to help relieve upstream flooding issues. The Relief Sewer and the 7th <br /> Ward Sewer connect to same junction structure in Fairview Park which then travels south to the 7th <br /> Ward Combined Sewer Overflow facility. <br /> Figure 4 below contains selected inspection photos detailing the condition of the 7th Ward Sewer. <br /> Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.