My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-19 ACCEPTING THE BID AND AUTHORIZING A CONTRACT Transfer House Structural Repairs
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-19 ACCEPTING THE BID AND AUTHORIZING A CONTRACT Transfer House Structural Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:18 AM
Creation date
7/23/2015 10:54:29 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-19
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING EXECUTION OF CONTRACT FOR TRANSFER HOUSE STRUCTURAL REPAIRS
Department
Public Works
Approved Date
3/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br /> GC-1 CERTIFICATE OF INSURANCE(Continued) <br /> Notice: <br /> It shall be an affirmative obligation upon the contractor to advise the City's , <br /> Representative at Fax No. (217). 424-2799 or mail to CITY ENGINEER, 1 GARY K. <br /> ANDERSON PLAZA, DECATUR, IL 62523, within two days of the cancellation or substantive <br /> change of any insurance policy set out above, and failure to do so shall be construed to be a ' <br /> breach of the contract. <br /> NOTICE: THIS CONTRACT WILL NOT BE AWARDED UNTIL THE <br /> CONTRACTOR HAS PROVIDED THE CITY WITH A CONTRACT PERFORMANCE <br /> BOND AND PROOF OF INSURANCE. <br /> GC-2 CLEANUP <br /> The Contractor shall at all times keep the premises free from accumulations of surplus <br /> excavated material, waste material or rubbish caused by their employees or work. , <br /> Upon completion of the work, the Contractor shall remove all their rubbish from and <br /> about the structures, buildings, and premises, also all their tools, equipment, scaffolding and <br /> surplus materials, and shall leave their work clean, ready for use. In case of dispute, the Owner <br /> may remove the rubbish and surplus materials and charge cost of removals to the Contractor or <br /> separate contractors, if any, in proportion to amounts determined by the Engineer to be just. ' <br /> GC-3 CONSTRUCTION STAKING <br /> The <br /> Engineer shall provide basic line and grade staking for construction. Such basic line <br /> g <br /> and grade shall be limited in general to: <br /> 1 not more than two base lines (generally perpendicular to each other) and one bench <br /> ( ) (g Y p 1P <br /> mark for a building, a plant site or a major structure; and <br /> stakes where applicable, at all changes ' <br /> (2) centerline stakes and offset grade pp es in g <br /> direction, manhole location, special structure, or similar critical location, together <br /> with bench marks, as may be necessary, along the line of work for utility <br /> distribution and transmission lines. <br /> Any additional (detailed) construction staking shall be provided by the Contractor, who , <br /> shall be fully responsible for transfer of data from the basic lines and grades provided by the <br /> Engineer. Detailed construction staking shall generally include such items as slope stakes, <br /> intermediate centerline stakes, additional offset grade stakes and similar work. The Contractor <br /> shall also be responsible for setting of all offsets, lines, string lines, reference points, reference <br /> grades, and similar control data required to execute the work under this contract. ' <br /> 21 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.