Laserfiche WebLink
City of Decatur Exhibit A �� <br /> Midwest Inland Port Tronsporatlon Plan and Capital Improvements Plan <br /> OM <br /> Engineering Manhour and Fee Estimate <br /> Project Deputy Sr.Struct Struct Rdwy civil civil TechAdmin Deputy MH Avg Raw Factored <br /> Task Man r PME neer En Inver E Inver Eng,1 E .2 PM-TP Totals Rats Labor Labor <br /> Crede Se Ion Ana is 09000 <br /> sfadis roadwa tem to r re separation 0. 2.0 0.0 0.0 0.0 0. 0.0 4.0 1. 205.28 5=2 <br /> Establish span configuration for underpass 0.0 0.0 4.0 2.0 00 0.0 0.0 00 00 0.0 6.0 $61.59 $369.52 $1,012.67 <br /> Determine Superstructure depth for underpass 0.0 0.0 2.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 $61.59 $184.76 $50633 <br /> Develop roadway profile for underpass 0.0 0.0 2.0 0.0 0.0 0.0 160 0.0 0.0 0.0 18.0 $38.22 $68800 $1,88546 <br /> Evaluate retaining waWabutmentoptions-UP 0.0 00 8.0 3.0 0.0 00 00 0.0 0.0 0.0 11.0 $62.78 $69060 $1892.59 <br /> Evaluate construction options for underpass 001 0.0 12.0 3.0 0.01 00 00. 0.0 0.01 00 15.01 4 22 $963.24 $2,639.76 <br /> Evaluate options for draining underpass 0.0 0.0 2.0 00 00 00 6.01 0.0 0.0 0.0 8.0 $42.90 $343.20 $940.54 <br /> Evaluate impacts of UP to business access 00 03 120 0.0 0.0 0.0 240 0.0 0.0 0.0 36.0 S4571 $1645 44 $4,50933 <br /> Deneb limina uantities for ands ss 00 0.0 3.0 0.0 0.0 16.0 00 0.0 0.0 0.0 19.0 S3825 $72672 $199158 <br /> b limas cost estimate r under ss .0 0.0 16.0 0.0 0. 0 18. 59 1804. 8 <br /> Establish span configuration for overpass 0.0 00 4.0 1.0 0.0 0.0 0.0 0.0 00 00 50 $64.22 $321.08 $879.92 <br /> Determine superstructure depth for overpass 00 00 2.0 10 0.0 0.0 0.0 0.0 00 00 30 $61.59 $184.76 $506.33 <br /> Develop roadway profile for overpass 0.0 0.0 2.0 0.0 0.0 0.0 16.0 0.0 00 00 18.0 $38.22 $688.00 $1,a85.46 <br /> Evaluate retaining walyaWtmentoptions-OP 0.0 0.0 6.0 1.0 0.0 0.0 0.0 00 00 0.01 7.0 $65.34 $457.40 $1253.50 <br /> Evaluate construction options for overpass 0.0 0.0 6.0 4.0 0.0 0.0 0.0 0.0 U. 0.0 10.0 $60.27 2.72 $1651.75 <br /> Evaluate Impacts of OP to business access 0.0 0.0 12.0 0.0 00 00 24.0 0.0 0.0 0.0 36.0 $45.71 $1 645.44 $4,509. <br /> Develop preliminary quantities for overpass 0.0 0.0 3.0 0.0 0.0 16.0 00 0.0 0.0 0.0 19.0 $38.25 $726.72 $1991.58 <br /> Den_elop Preliminarycost estimate for overpass 0.0 0.0 2.0 0.0 0.0 16.0 0.0 0.0 0.0 0.0 18.0 $36.59 $658.56 $1,804.78 <br /> Total This Task 0.0 0.0 86.0 160 00 64.0 88.0 0.0 0.0 0.0 254.0 $46.30 $11,760.00 $32,228.28 <br /> San sewer Improvements(10000) <br /> Review Sanitary Sever Imixavements 0.0 2.01 00 00 00 0.0 0.0 0.0 0.0 0.0 2.0 $68.16 $136.32 $373.58 <br /> Total This Task 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 $68.16 $136.32 $373.58 <br /> Storm Water Drainage Analysis M 1000) <br /> Review Storm Water Drainage Analysis 00 4.0 0.0 00 0.0 0.0 0.0 0.0 0.0 0.0 4.0 $68.16 $272.64 $747.17 <br /> otal This as 4.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 $68.16 $272.64 $747 1 <br /> IdentKy Potential Fundi ourcea <br /> Review Potential Funding Sourcces 0.0 1.0 0.0 0.0 0.0 0.01 0.0 0.0 00 0.0 1.0 $68.16 $68.16 $18679 <br /> Total as 1. 0.0 0.0 0.0 0.0 0.0 1. .1 9 .1 1 <br /> Prepare ra 8 Final Report <br /> Description and location of project 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 00 00 1.0 $32.64 $32.64 $89.45 <br /> M-Cription of existing facility 0.0 0.0 0.0 0.0 0.0 1.5 0.0 0.0 00, 00 1.5 $32.64 S48.961 $134.17 <br /> Desain of adjacent typical sections 0.0 0.0 0.0 0.0 0.0 10 0.0 0.0 0.0 0.0 1.0 $32.64 $32.64 $89.45 <br /> Mw7rimm Froposeaimprovement 0.0 0.0 0.0 0.0 0.0 0.0 OMO 0.0 0.0 0.0 00 I I <br /> Purpose and reed 0.0 1.0 0.0 0.0 00 00 00 0.0 0.0 0.0 1.0 $68.16 $68.16 $186.79 <br /> Design guidelines 0.0 0.0 0.0 0.0 00 1.0 0.0 0.0 0.0 0.0 1.0 $32.64 $32.64 $8945 <br /> Functional classification 0.0 0.0 0.0 0.0 00 05 0.0 0.0 0.0 0.0 0.5 $32.64 $16.32 $44.72 <br /> Regulatory or posted speed limit 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0 00 0.0 0.5 $32.64 $16.32 $44.72 <br /> Work to be accomplished 0.0 0.0 00 0.0 0.0 4.0 0.0 0.0 0.0 0.0 40 $32.64 $130.56 $357.80 <br /> Items affecting improvement 0.0 0.0 00 0.0 0.0 3.0 0.0 0.0 0.0 0.0 3.0 $32.64 $97.92 $268.35 <br /> Design variances 1 0.01 0.0 0.0 0.0 00 20 0.0 0.01 0.01 00 2.0 $32.641 $65.28 $178.90 <br /> R'ht-obwa requirements 0.0 0.0 00 0.0 00 1.0 0.0 0.0 0.0 0.0 1.0 $32.64 $32.64 $89.45 <br /> Im CL9 t0 utilities and util uiremens 0.0 0.0 0 0 0 0 0.0 3.0 0.0 0.0 0.0 0.0 3.0 $32.64 $97.92 $268.35 <br /> me farm'. m cts 0 0 0.01 UU1 0.0 :e.ul UA U.Ul U.Ul U.Ul 2.UI $32.641 .28 178.90 <br /> Preliminary cost estimate 0.01 2.01 0.01 0.01 0.01 24.01 0.01 0.01 0.01 0.01 26.01 $35.37 $919681 $2,520.38 <br /> MIP Tasks&Manhours-1-12-15 A-18 <br />