Laserfiche WebLink
charges of all professionals and consultants,allowances for the cost of land and rights-of-way, <br /> allowances for the relocation of utility facilities and equipment if necessary, and compensation <br /> for or damages to properties and interest and financing charges utilizing and based on the <br /> information obtained or produced during the preliminary design phase and documents. <br /> 4. Document Presentation. Furnish paper copies and digital copies of the Preliminary Design <br /> Report("Design Report")in the number and format specified in the Exhibit A, Scope of Work <br /> and present and review the Design Report in person with the City as the City's Representative <br /> shall direct. The cost of document reproduction shall be considered to be a reimbursable expense <br /> and paid in accordance with Section V(C) of this Agreement. <br /> 5. Completion Time. The Preliminary Design Report shall be completed, submitted and accepted <br /> by the City's Representative within the time period set forth in Exhibit C, Project Timeline. <br /> SECTION III. CITY'S RESPONSIBILITIES <br /> The City shall, <br /> A. FURNISH REQUIREMENTS AND LIMITATIONS. Provide all criteria and full information as <br /> to the City's requirements for the Project, including design objectives and constraints, space, capacity <br /> and performance requirements, flexibility and expandability, economic parameters and any budgetary <br /> limitations; and furnish copies of all design and construction standards which the City will require to <br /> be included in the Drawings and Specifications. <br /> B. FURNISH INFORMATION. Assist the Consulting Engineer by placing at the Consulting <br /> Engineer's disposal all available information pertinent to the Project including previous reports and <br /> any other data relative to design or construction of the Project. <br /> C. FURNISH TECHNICAL INFORMATION. Furnish to the Consulting Engineer, as required for <br /> performance of the Consulting Engineer's Basic Services (except to the extent provided otherwise in <br /> Exhibit A, "Scope of Work"), data prepared by or services of others, including without limitation, <br /> core borings,probings and subsurface explorations, hydrographic surveys, laboratory tests and <br /> inspections of samples, materials and equipment; appropriate professional interpretations of all of the <br /> foregoing; environmental assessment and impact statements; property,boundary, easement, right-of- <br /> way, topographic and utility surveys; property descriptions; zoning, deed and other land use <br /> restriction; all of which the Consulting Engineer may rely upon in performing the Consulting <br /> Engineer's services. <br /> D. SURVEYS AND REFERENCE POINTS. Provide field control surveys and establish reference <br /> points and base lines except to the extent provided otherwise in Section II to enable the Contractor(s) <br /> to proceed with the layout of the work. <br /> Last Revised:05/15/2013 <br />