Laserfiche WebLink
1 f <br /> sufficient to permit the construction contractor("Contractor")to construct the improvement <br /> within the construction tolerances established in the Project specifications. In addition,the <br /> number of control points shall be consistent with standard engineering practice. <br /> 2. Replacement of Lost Control Points. Control points which are lost, damaged,removed or <br /> otherwise moved by the Contractor or others shall be promptly replaced by the Consulting <br /> Engineer or Surveyor and costs for such replacement shall be computed on a time and materials <br /> basis,and reimbursed by the City or its construction contractor. <br /> 3. Accuracy. The Consulting Engineer or Surveyor shall provide the horizontal and vertical control <br /> points within the same measurement tolerances as the construction tolerances established in the <br /> Project specifications. The Consulting Engineer or Surveyor shall be responsible for the accuracy <br /> of the control points which are established. The Consulting Engineer or Surveyor shall be <br /> responsible for costs which may result from errors by the Consulting Engineer or Surveyor in <br /> placement of control points. <br /> The Consulting Engineer or Surveyor shall take all reasonable and customary actions to protect <br /> the control points established by the Consulting Engineer or Surveyor. <br /> 4. Completion Time. The Construction Survey and Layout Phase shall be completed within the <br /> time period set forth in Exhibit C,Project Timeline. <br /> D. CONSTRUCTION INSPECTION PHASE, <br /> The Consulting Engineer shall, after written authorization to proceed with the Construction Inspection <br /> Phase: <br /> 1. General Duties. The Consulting Engineer shall consult with and advise the City's Representative <br /> and act as its representative as provided herein and in the General Conditions of the construction <br /> contract for the Project. The primary responsibility of the Consulting Engineer in this phase of <br /> the work shall be quality control inspection of the materials,construction methods and techniques <br /> to assure that the Contractor builds the project in accordance with the plans and specifications. <br /> 2. Construction Inspection and Reporting. The Consulting Engineer shall make visits to the site at <br /> intervals appropriate to the various stages of construction to observe as an experienced and <br /> qualified design professional the progress and quality of the executed work of the Contractor and <br /> to determine in general if such work is proceeding in accordance with the Contract Documents. <br /> During such visits and on the basis of on-site observations,the Consulting Engineer shall keep the <br /> City's Representative informed of the progress of the work, shall endeavor to guard the City <br /> against defects and deficiencies in such work and may disapprove or reject work failing to <br /> conform to the Contract Documents. Fefmalnetion of the pr-egfess of` ef!E shall be in the <br /> . Project schedule updates shall be submitted to the City's <br /> Representative in writing. <br /> 3. Review of Technical and Procedural Aspects. The Consulting Engineer shall review and approve <br /> (or take other appropriate action in respect to Shop Drawings,the results of tests and inspections <br /> and other data which each Contractor is required to submit, determine the acceptability of <br /> substitute materials and equipment proposed by the Contractor(s),and receive and review(for <br /> general content as required by the Specifications)maintenance and operating instructions, <br /> schedules, guarantees,bonds and certificates of inspection which are to be assembled by the <br /> Contractor(s). <br /> Last Revised:05/15/2013 <br />