|
Project Name: Street Restoration
<br /> Engineer's Estimate Tyrolt, Inc. dba Dunn Co.
<br /> Project Number: 2014-08, Section No. 14-00408-00-FP 724 N Mercer Street
<br /> Decatur,IL 62522
<br /> City Engineering Division
<br /> Bid Date: Monday,June 9, 2014 Ph. 217-429-4444
<br /> Fax 217-429-7917
<br /> Time: 10:00 A.M.
<br /> Darin Lippolt
<br /> Fund: Motor Fuel Tax Funds
<br /> Ipgoltd(a1dunnco.com
<br /> Organization Code: 46484606
<br /> Object Code: 489070
<br /> Item Pay Item Quantity Unit Unit Price Total Unit Price Total
<br /> Number
<br /> 30103000 SHAPING&GRADING ROADWAY 3,200.00 SQ YD $4.35 $13,920.00 $6.35 $20,320.00
<br /> 30103005 PULVERIZE,SHAPE&COMPACT 3,200.00 SQ YD $3.40 $10,880.00 $3.25 $10,400.00
<br /> 35200420 PROCESSING SOIL CEMENT BASE COURSE, 12 INCH 3,200.00 SQ YD $7.15 $22,880.00 $7.00 $22,400.00
<br /> 35200500 CEMENT 3,348.80 100 WT $6.75 $22,604.40 $6.50 $21,767.20
<br /> 40600100 BITUMINOUS MATERIAL(PRIME COAT)RC70/CSS-1h 3,685.40 GAL $3.00 $11,056.20 $3.00 $11,056.20
<br /> 40600400 MIXTURE FOR CRACKS,JOINTS,AND FLANGEWAYS 10.00 TON $275.00 $2,750.00 $199.00 $1,990.00
<br /> 40600625 LEVEL BINDER(MACHINE METHOD), N50 581.00 TON $107.50 $62,457.50 $101.00 $58,681.00
<br /> 40600982 HOT MIX ASPHALT SURFACE REMOVAL-BUTT-JOINT 149.99 SQ YD $31.00 $4,649.69 $30.00 $4,499.70
<br /> 40603080 HOT MIX ASPHALT BINDER COURSE, IL-19.0, N50 418.60 TON $103.00 $43,115.80 $100.30 $41,985.5
<br /> 40603310 HOT MIX ASPHALT SURFACE COURSE, MIX"C-, N50 2,335.98 TON $107.50 $251,117.85 $99.00 $231,262.02
<br /> 42400200 PORTLAND CEMENT CONCRETE SIDEWALK, 5 INCH 3,858.50 SQ FT $7.50 $28,938.75 $9.50 $36,655.7
<br /> 42400800 DETECTABLE WARNINGS 310.00 SQ FT $38.00 $11,780.00 $40.00 $12,400.00
<br /> 44000155 HOT MIX ASPHALT SURFACE REMOVAL, 1 1/2 INCH 24,569.33 SQ YD $4.50 $110,561.99 $3.20 $78,621.8
<br /> 44000157 HOT MIX ASPHALT SURFACE REMOVAL,2 INCH 3,200.00 SQ YD $4.60 $14,720.00 $3.55 $11,360.00
<br /> 44000600 SIDEWALK REMOVAL 3,594.50 SQ FT $3.00 $10,783.50 $3.00 $10,783.50
<br /> 44001700 COMBINATION CONCRETE CURB&GUTTER REMOVAL& 918.50 FOOT $70.00 $64,295.00 $70.00 $64,295.00
<br /> REPLACEMENT
<br /> 44200994 CLASS B PATCHES,TYHPE II, 12 INCH 472.30 SQ YD $184.00 $86,903.20 $155.00 $73,206.50
<br /> 44200996 CLASS B PATCHES,TYPE III, 12 INCH 44.20 SQ YD $195.00 $8,619.00 $152.00 $6,718.40
<br /> 44201000 CLASS B PATCHES,TYPE IV, 12 INCH 146.90 SQ YD $175.00 $25,707.50 $150.00 $22,035.00
<br /> 44201299 DOWEL BARS, 1-1/2 INCH 644.00 EACH $17.00 $10,948.00 $13.00 $8,372.00
<br /> 44201705 CLASS D PATCHES,TYPE II,5 INCH 96.00 SQ YD $85.00 $8,160.00 $91.50 $8,784.00
<br /> 44201709 CLASS D PATCHES,TYPE III,5 INCH 127.20 SQ YD $85.00 $10,812.00 $91.50 $11,638.80
<br /> 44201711 CLASS D PATCHES,TYPE IV,5 INCH 2,784.90 SQ YD $85.00 $236,716.50 $91.50 $254,818.3
<br /> 44213200 SAWCUTS 3,782.00 FOOT $4.25 $16,073.50 $5.00 $18,910.00
<br /> 44213202 TIE BARS, 1 INCH 634.00 EACH $15.00 $9,510.00 $11.00 $6,974.00
<br /> 45100200 CRACK FILLING 22,486.40 POUND $2.35 $52,843.04 $4.00 $89,945.60
<br /> 60207105 CATCH BASINS,TYPE C,TYPE 3 FRAME AND GRATE 2.00 EACH $2,500.00 $5,000.00 $1,897.50 $3,795.00
<br /> 60250600 CATCH BASINS TO BE ADJUSTED WITH NEW TYPE 3 FRAME AND 5.00 EACH $1,700.00 $8,500.00 $1,897.50 $9,487.50
<br /> G RATE
<br /> Dane 1 of 9
<br />
|