Laserfiche WebLink
t i <br /> Illinoisrtment Affidavit of Availability <br /> of Transportation For the Letting of 6/9/2014 <br /> ' <br /> Bureau of Construction (Letting date) <br /> 2300 South Dirksen Parkway/Room 322 Instructions: Complete this form by either typing or using black ink. <br /> ' <br /> Springfield, I IIIftOIS 62764 "Authorization to Bid"will not be issued unless both sides of this form are completed in detail. Use additional forms as needed to list all work. <br /> Part I. Work Under Contract <br /> List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or <br /> ' rejected. In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most <br /> recent engineer's or owners estimate,and must include work subcontracted to others. If no work is contracted,show NONE. <br /> 1 2 3 4 Awards Pending <br /> Contract Number Champaign Cty MacArther HS St T HS ADM Intermodal 87566 <br /> Contract With Open Road Williams Bros Otto Baum Stark Streator Asphalt <br /> ' Estimated Completion Date 7/14 8114 9/14 6/14 8/14 <br /> Total Contract PriceAccumulated <br /> 379,012.00 157,751.00 219,988.00 219,152.00 348,188.00 Totals <br /> Uncompleted Dollar Value if Firm Is the <br /> ' Prime Contractor 0.00 <br /> Uncompleted Dollar Value if Firm Is the <br /> Subcontractor 1 379,012.001 131,291.001 219,988.00 177,797.00 348,188.00 1,256,276.00 <br /> Total Value of All Work 19256,276.00 <br /> Part II. Awards Pending and Uncompleted Work to be done with your own forces. <br /> List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work Accumulated <br /> subcontracted to others will be listed on the reverse of this form. In a joint venture,list only that portion of the work to be done by your <br /> ' company. If no work is contracted,show NONE. Totals <br /> Earthwork 0.00 <br /> Portland Cement Concrete Paving 0.00 <br /> ' HMA Plant Mix 0.00 <br /> HMA Paving 90,365.00 86,710.00 161,000.00 338,075.00 <br /> Clean&Seal Cracks/Joints 7,000.00 7,000.00 <br /> ' Aggregate Bases&Surfaces 5,605.00 46,334.00 51,939.00 <br /> Highway,R.R.and Waterway Structures 0.00 <br /> ' Drainage 0.00 <br /> Electrical 0.00 <br /> Cover and Seal Coats 21,170.00 21,170.00 <br /> ' Concrete Construction 0.00 <br /> Landscaping 0.00 <br /> ' Fencing 0.00 <br /> Guardrail 0.00 <br /> Painting 0.00 <br /> ' Signing 1,050.00 1,050.00 <br /> Cold Milling,Planning&Rotomilling 69,056.00 17,342.00 16,797.00 33,425.00 136,620.00 <br /> Demolition 0.00 <br /> ' Pavement Markings(Paint) 0.00 <br /> Other Construction(List) 0.00 <br /> ' Stabilization 66,352.00 66,352.00 <br /> CIR 309,956.00 314,763.00 624,719.00 <br /> Totals 379,012.00 124,140.00 217,788.00 177,797.00 348,188.00 1,246,925.00 <br /> Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procurement Code". Failure to comply will <br /> result in non-issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center. <br /> i <br /> Printed 6/9/2014 Page 1 of 10 BC 57(Rev.08/17/10 <br />